Fatts Customs Construction
- Based in
- San Bruno
- On San Francisco permits
- Nov 2016 to Jan 2021
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2019 | Completed final sign-off Mar 2019 | 2936 Gough St | revsion to #201811156056. add to scope description: replace finishes in new bathroom sheetrock, baseboard, etc. (note: job valuation has been paid for under prvious permit, valuation was #30,000 per m.walls)Details
revsion to #201811156056. add to scope description: replace finishes in new bathroom sheetrock, baseboard, etc. (note: job valuation has been paid for under prvious permit, valuation was #30,000 per m.walls) | |
| Nov 15, 2018 | Completed final sign-off Feb 2019 | 2936 Gough St | remove non bearing wall between bathroom & wc. n/a maherDetails
remove non bearing wall between bathroom & wc. n/a maher | $30,000 |
| Feb 21, 2018 | Completed final sign-off May 2018 | 840 Kansas St | one bathroom remodel like for like new toilet ,tub, shower & vanity new valve for tub/shower new sheetrock tape & smooth coat , (e) laundry room relocate plumbing for a stacked washer & dryer combo unit, no change in walls & opening layoutDetails
one bathroom remodel like for like new toilet ,tub, shower & vanity new valve for tub/shower new sheetrock tape & smooth coat , (e) laundry room relocate plumbing for a stacked washer & dryer combo unit, no change in walls & opening layout | $20,500 |
| Sep 6, 2017 | Completed final sign-off Jan 2018 | 1011 Green St | update (e) led recessed lights in master bath, install (2) wall mount faucets/enlarge shower pan, revisioni to bpa#201707172087 for additional work.Details
update (e) led recessed lights in master bath, install (2) wall mount faucets/enlarge shower pan, revisioni to bpa#201707172087 for additional work. | $5,000 |
| Jul 17, 2017 | Completed final sign-off Jan 2018 | 1011 Green St | eliminate existing fireplace, eliminate chimney, eliminate pedestal sink, remove (e) bath tub and install double sink at (e) bath tub area, new shower, shift wall on north side of bathroom, 13" north.Details
eliminate existing fireplace, eliminate chimney, eliminate pedestal sink, remove (e) bath tub and install double sink at (e) bath tub area, new shower, shift wall on north side of bathroom, 13" north. | $15,000 |
| Feb 21, 2017 | Completed final sign-off Jul 2017 | 2932 Gough St | unit #2932 & #2934 each unit: convert existing toilet room to full bath. rearranging bathrooms for removing non-bearing walls & add non-bearing walls.Details
unit #2932 & #2934 each unit: convert existing toilet room to full bath. rearranging bathrooms for removing non-bearing walls & add non-bearing walls. | $20,000 |