Back to bathroom remodel contractors
Family Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Jun 2019
- Last 24 months
- 0 permits filed
60 permits since 2000: 46 completed, 4 never finaled, 10 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 15, 2019 | Completed final sign-off Aug 2019 | 723 25th Av | revision to app#201805219642. reconfigure remodel bath plumbing fixture location. repair rear deck waterproofing less than 50%.Details
revision to app#201805219642. reconfigure remodel bath plumbing fixture location. repair rear deck waterproofing less than 50%. | |
| Apr 11, 2006 | Never finaled issued Apr 2006, no final | 3204 Mission St | remodel kitchen (with all fluor lights) relocated dining room, add new bathroom for the master bedroom. replace all windows (in kind. same size & same material) with double glaze windows.Details
remodel kitchen (with all fluor lights) relocated dining room, add new bathroom for the master bedroom. replace all windows (in kind. same size & same material) with double glaze windows. | $30,000 |
| Jan 13, 2006 | Completed final sign-off Apr 2006 | 360 Mississippi St | 2nd floor bathroom remodeling (interior only).new lighting,all flourescent lights.no structural work.Details
2nd floor bathroom remodeling (interior only).new lighting,all flourescent lights.no structural work. | $12,800 |
| Aug 9, 2005 | Completed final sign-off Mar 2006 | 4621 19th St | interior remodeling for e kitchen,e bath, interior painting. change cabinet,dishwasher, refrig, launDetails
interior remodeling for e kitchen,e bath, interior painting. change cabinet,dishwasher, refrig, laun | $57,000 |
| Apr 1, 2005 | Completed final sign-off Jun 2005 | 360 Mississippi St | 3rd floor bathroom remodeling (interior only).Details
3rd floor bathroom remodeling (interior only). | $7,800 |
| Sep 11, 2003 | Completed final sign-off Nov 2003 | 2061 Thomas Av | bathroom remodeling 2nd flDetails
bathroom remodeling 2nd fl | $6,000 |
| Oct 31, 2001 | Expired or cancelled expired Oct 2002 | 363 Richland Av | interior remodeling, kitchen & bath remodelDetails
interior remodeling, kitchen & bath remodel | $14,000 |
| Jun 11, 2001 | Completed final sign-off Jul 2001 | 397 Mangels Av | 2 bathrooms. change of bath tub, lavatory, toilet, gyp.brd. & electrical lights. kitchen floor of maDetails
2 bathrooms. change of bath tub, lavatory, toilet, gyp.brd. & electrical lights. kitchen floor of ma | $16,000 |