Back to bathroom remodel contractors
Faith Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Apr 2009
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 12, 2006 | Completed final sign-off Apr 2007 | 2340 Gough St | remodel master bath: move vanity sink, replace shower with new custom, replace (e) finishes with new, replace toilet with new. no change to building envelope. no structural alteration.Details
remodel master bath: move vanity sink, replace shower with new custom, replace (e) finishes with new, replace toilet with new. no change to building envelope. no structural alteration. | $15,000 |