Back to bathroom remodel contractors
Faherty Construction Inc
- Based in
- San Bruno
- On San Francisco permits
- Nov 2017 to Aug 2026
- Last 24 months
- 3 permits filed
25 permits since 2000: 21 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 in progress. Typically 0 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 1960 Vallejo St | unit #9: interior renovation of existing kitchen (240sf) and existing 3 bathrooms (100sf each) in kind no changes to wall or floor plan.Details
unit #9: interior renovation of existing kitchen (240sf) and existing 3 bathrooms (100sf each) in kind no changes to wall or floor plan. | $150,000 |
| Dec 3, 2025 | Completed final sign-off Jul 2026 | 128 Castenada Av | replace kitchen in kind. new millwork, countertops. replace bathroom tile in kind.Details
replace kitchen in kind. new millwork, countertops. replace bathroom tile in kind. | $100,000 |
| Mar 25, 2022 | Completed final sign-off Jan 2023 | 200 Brannan St | apt 109: remodel 2 bathrooms in kind.Details
apt 109: remodel 2 bathrooms in kind. | $60,000 |
| Dec 13, 2021 | Completed final sign-off Jul 2022 | 226 Moraga St | kitchen and bath remodel. new cabinetry, appliances, plumbing fixtures, flooring, drywall.Details
kitchen and bath remodel. new cabinetry, appliances, plumbing fixtures, flooring, drywall. | $15,000 |
| Dec 13, 2021 | Completed final sign-off Apr 2023 | 1998 Broadway | #1501: interior renovation of extg bedroom, extg kitchen, and extg 2 bathroomsDetails
#1501: interior renovation of extg bedroom, extg kitchen, and extg 2 bathrooms | $100,000 |
| Nov 17, 2020 | Completed final sign-off Sep 2023 | 999 Green St | demo 3 bathrooms, replace all in kind with new finishes. install new tile floorDetails
demo 3 bathrooms, replace all in kind with new finishes. install new tile floor | $100,000 |
| May 29, 2020 | Completed final sign-off Mar 2021 | 449 Parker Av | remove existing kitchen and replace with new kitchen in kind; remove existing pantry and replace with new pantry in kind; remove existing bathroom and replace with new bathroom in kindDetails
remove existing kitchen and replace with new kitchen in kind; remove existing pantry and replace with new pantry in kind; remove existing bathroom and replace with new bathroom in kind | $100,000 |
| Aug 8, 2018 | Completed final sign-off May 2019 | 1845 Church St | remodel extg bathroom in lower level unit. renovate 2 extg closets to become a bath, upgrade lighting and plumbing in both spaces. adjust windows in lightwell. same size and frameDetails
remodel extg bathroom in lower level unit. renovate 2 extg closets to become a bath, upgrade lighting and plumbing in both spaces. adjust windows in lightwell. same size and frame | $50,000 |