Fahan Construction Inc
- Based in
- Fairfax
- On San Francisco permits
- Oct 2021 to Sep 2026
- Last 24 months
- 7 permits filed
19 permits since 2000: 14 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 154 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2023 | Completed final sign-off Jan 2024 | 715 Teresita Bl | remove and replace exttg deck boards and guardrails with zero maintenance materials. trex decking and aluminum handrails and cable rails at the back of the houseDetails
remove and replace exttg deck boards and guardrails with zero maintenance materials. trex decking and aluminum handrails and cable rails at the back of the house | $15,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2022 | 1747 40th Av | remove back patio cover, install new rear deck, new back double door, new hot tub. replace rear window.Details
remove back patio cover, install new rear deck, new back double door, new hot tub. replace rear window. | $15,000 |