Back to bathroom remodel contractors
Fahan Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to Feb 2020
- Last 24 months
- 0 permits filed
64 permits since 2000: 58 completed, 6 never finaled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 22 completed, 2 never finaled. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2019 | Completed final sign-off Jun 2021 | 2738 Great Hy | residential renovation including renovation kitchen, renovate powder room, renovate master bath, new structural, and new lighting. no exterior change.Details
residential renovation including renovation kitchen, renovate powder room, renovate master bath, new structural, and new lighting. no exterior change. | $125,000 |
| Sep 24, 2018 | Completed final sign-off Apr 2019 | 377 Clipper St | renovation of single family residentce - new windows replace in kind, new master bath, renovate (e) upstairs bath, new closets, new lightingDetails
renovation of single family residentce - new windows replace in kind, new master bath, renovate (e) upstairs bath, new closets, new lighting | $60,000 |
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 20 Adair St | revision to pa 2018-0807-6591, replace (e) windows in bathroom with windows of the same size in the same location. (n) skylight in hallwayDetails
revision to pa 2018-0807-6591, replace (e) windows in bathroom with windows of the same size in the same location. (n) skylight in hallway | $16,500 |
| Aug 7, 2018 | Completed final sign-off Apr 2019 | 20 Adair St | remodel existing kitchen & bathroom, partial interior remodel including (n) bathroom fixtures, appliances, services and finishes and (n) kitchen case work, fixtures, appliances, services & finishes, replace windows at rearDetails
remodel existing kitchen & bathroom, partial interior remodel including (n) bathroom fixtures, appliances, services and finishes and (n) kitchen case work, fixtures, appliances, services & finishes, replace windows at rear | $61,910 |
| Apr 17, 2017 | Completed final sign-off Mar 2018 | 1980 Vallejo St | interior renovation to existing apartment/condiminium remodel of existing kitchen and laundry room and 3 baths. new finishes and cabinetry. no change to windows and mech system. interior changes onlyDetails
interior renovation to existing apartment/condiminium remodel of existing kitchen and laundry room and 3 baths. new finishes and cabinetry. no change to windows and mech system. interior changes only | $375,000 |
| Feb 1, 2017 | Completed final sign-off Jun 2017 | 464 Hill St | remodel of (e) 3rd floor master bathroom to include new finishes , lighting, electrical, plumbing fixtures. no structural work, no change to building envelopeDetails
remodel of (e) 3rd floor master bathroom to include new finishes , lighting, electrical, plumbing fixtures. no structural work, no change to building envelope | $16,000 |
| Oct 6, 2016 | Completed final sign-off Jul 2017 | 795 Sutter St | remove non structural partitions as indicated. remodel (e) bathroom, bedroom and entryDetails
remove non structural partitions as indicated. remodel (e) bathroom, bedroom and entry | $40,000 |
| Aug 16, 2016 | Completed final sign-off Dec 2016 | 1295 Monterey Bl | remodel bathroom @ 2nd floor, remove exisitng cabinets, fixtures & faucets, replace with new. mech, elec to remain in (e) locations. n/a maher ordinanceDetails
remodel bathroom @ 2nd floor, remove exisitng cabinets, fixtures & faucets, replace with new. mech, elec to remain in (e) locations. n/a maher ordinance | $20,000 |
| Jun 27, 2016 | Completed final sign-off Sep 2016 | 145 09th Av | bathroom remodel - no walls removed or addedDetails
bathroom remodel - no walls removed or added | $20,000 |
| May 25, 2016 | Completed final sign-off Oct 2017 | 540 Fillmore St | remodel 1 kitchen and bath and opening walls for installation of new elecrical and plumbing. no change in wallDetails
remodel 1 kitchen and bath and opening walls for installation of new elecrical and plumbing. no change in wall | $35,000 |
| Mar 24, 2016 | Completed final sign-off Oct 2017 | 540 Fillmore St | bathroom remodel; compliance with maher ordinance no 155-13 not required.Details
bathroom remodel; compliance with maher ordinance no 155-13 not required. | $10,000 |
| Jun 15, 2015 | Completed final sign-off Sep 2015 | 843 Capp St | bathroom remodel, installation of shower pan, vanity toilet & clawfoot tub. upper unit.Details
bathroom remodel, installation of shower pan, vanity toilet & clawfoot tub. upper unit. | $10,000 |
| May 4, 2015 | Completed final sign-off Nov 2015 | 1990 Green St | remodel of 1 kitchen and 1 bathroom, lay new floors throughout condo, paint entire condo. no walls moved, removed or added. all existing layout to remain unchanged.Details
remodel of 1 kitchen and 1 bathroom, lay new floors throughout condo, paint entire condo. no walls moved, removed or added. all existing layout to remain unchanged. | $22,000 |
| Apr 7, 2015 | Completed final sign-off Dec 2015 | 2090 Pacific Av | remodel unit 603. remodel e bath and kitchen. remove partition wall beween kitchen and dining area. modify walls at bathroom and closet areaDetails
remodel unit 603. remodel e bath and kitchen. remove partition wall beween kitchen and dining area. modify walls at bathroom and closet area | $35,000 |
| Feb 18, 2015 | Completed final sign-off Aug 2016 | 2368 Greenwich St | remodel 2 units. remodel extg bathrooms and kitchens at both units. remove and modify walls. expand lower unit at 2nd level to new ground floor living space. new roof deck for upper unit. replace windows throughout.Details
remodel 2 units. remodel extg bathrooms and kitchens at both units. remove and modify walls. expand lower unit at 2nd level to new ground floor living space. new roof deck for upper unit. replace windows throughout. | $120,000 |
| Jun 30, 2014 | Completed final sign-off Oct 2014 | 121 04th Av | removal of bath, toilet & shower, all sheetrock to studs, installation of new shower pan & tub, toilet, tile floors.Details
removal of bath, toilet & shower, all sheetrock to studs, installation of new shower pan & tub, toilet, tile floors. | $17,000 |
| Apr 7, 2014 | Completed final sign-off Jul 2014 | 275 Missouri St | removal of all lath and plaster to stud installation of new fixtures all in same location. tile bath surround and bathroom floor. all work in the bathroom on 2nd floor.Details
removal of all lath and plaster to stud installation of new fixtures all in same location. tile bath surround and bathroom floor. all work in the bathroom on 2nd floor. | $12,000 |
| Jan 8, 2014 | Completed final sign-off Jun 2014 | 1990 Green St | unit #601:two bathroom and one kitchen remodels. installation of new hardwood floors.Details
unit #601:two bathroom and one kitchen remodels. installation of new hardwood floors. | $45,000 |
| Nov 19, 2013 | Completed final sign-off Jan 2014 | 2043 Bush St | removal of 8 kitchen cabinets and replace in kind removal of bathroom tile and fixtures and replace in same location, no structural walls bring removed or change to floor layout, no windowsDetails
removal of 8 kitchen cabinets and replace in kind removal of bathroom tile and fixtures and replace in same location, no structural walls bring removed or change to floor layout, no windows | $25,000 |
| Oct 11, 2013 | Never finaled issued Oct 2013, no final | 321 Haight St | remodel existing half bath. remove non bearing walls to enlarge bath. install shower pan. install new wall mount toilet and replace exist. sink.Details
remodel existing half bath. remove non bearing walls to enlarge bath. install shower pan. install new wall mount toilet and replace exist. sink. | $15,000 |
| Jul 15, 2013 | Completed final sign-off Sep 2013 | 1889 46th Av | bathroom remodel installation of new bath and shower and vanity in same location. floor to ceiling tile. no structuralDetails
bathroom remodel installation of new bath and shower and vanity in same location. floor to ceiling tile. no structural | $20,000 |
| Jan 16, 2013 | Completed final sign-off May 2013 | 145 Castenada Av | replace existing bathroom and create a master bathroom. remodel closet per plan.Details
replace existing bathroom and create a master bathroom. remodel closet per plan. | $18,000 |
| Oct 25, 2012 | Completed final sign-off Jan 2013 | 471 Jersey St | divide closet into 2 spaces, 1 part linen closet & one part 1/2 bathroom. add wall between 2 spaces. add sink, toilet. add fan-exhaustDetails
divide closet into 2 spaces, 1 part linen closet & one part 1/2 bathroom. add wall between 2 spaces. add sink, toilet. add fan-exhaust | $11,000 |
| Dec 23, 2011 | Completed final sign-off Jun 2012 | 3232 18th St | interior remodel at upper level dwellng unit. remodel kitchen and extg bath, new bathroom. remove wall to create open living area. provide new beam.Details
interior remodel at upper level dwellng unit. remodel kitchen and extg bath, new bathroom. remove wall to create open living area. provide new beam. | $40,000 |