Permit GraphShortlistSan Francisco building permits since 2000

Fabiano Di Mestico

Contractor license
810033
State license record
Based in
San Mateo
On San Francisco permits
May 2018 to Oct 2025
Last 24 months
1 permit filed

3 permits since 2000: 1 in progress, 2 never finaled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllBathroom remodel 1

1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 27, 2021Never finaled
issued Sep 2021, no final
33 Vandewater Stunit 302. replace extg bathtub(same location) replace extg vanity(same location) remove pocket door. replace extg bathroom door. install wall tile surrounding the new tub. replace light fixtures. h.e. lighting & vacamcy sensor.
Details
Permit
202109279234
Status
issued
Filed
Sep 27, 2021
Permit issued
Sep 27, 2021
Declared cost
$18,000
Address
33 Vandewater St

unit 302. replace extg bathtub(same location) replace extg vanity(same location) remove pocket door. replace extg bathroom door. install wall tile surrounding the new tub. replace light fixtures. h.e. lighting & vacamcy sensor.

Open the permit page

$18,000