Back to bathroom remodel contractors
F P Investments Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Feb 2022
- Last 24 months
- 0 permits filed
26 permits since 2000: 18 completed, 1 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 301 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2016 | Expired or cancelled cancelled Aug 2016 | 2135 California St | remodel 1 bathroom in-kind at unit#2Details
remodel 1 bathroom in-kind at unit#2 | $12,000 |
| Jul 14, 2015 | Expired or cancelled expired May 2018 | 768 09th Av | remodel existing apt unit 4. replcate e kitchen and install new cabinets, fixtures, appliances. relocate e bath, convert portion of e liv rm into new bedroom and bath. relocate e wh and boiler, upgrade e lighting, net increase 1 bedrm, 1 bath. no change occupancy,use,floor area, setbacks,heights...Details
remodel existing apt unit 4. replcate e kitchen and install new cabinets, fixtures, appliances. relocate e bath, convert portion of e liv rm into new bedroom and bath. relocate e wh and boiler, upgrade e lighting, net increase 1 bedrm, 1 bath. no change occupancy,use,floor area, setbacks,heights... | $50,000 |
| May 23, 2014 | Completed final sign-off May 2018 | 992 Pine St | interior remodeling to the street level & 1st floor level. conversion of (e) office / storage at at street level into 2 bedrms, 2 baths residential apartment unit, street level and converting 2 bedrooms, 2 baths to 3 bedrooms 3 baths on the 1st floor. no work on top two levels.Details
interior remodeling to the street level & 1st floor level. conversion of (e) office / storage at at street level into 2 bedrms, 2 baths residential apartment unit, street level and converting 2 bedrooms, 2 baths to 3 bedrooms 3 baths on the 1st floor. no work on top two levels. | $100,000 |
| May 7, 2014 | Completed final sign-off Jul 2014 | 768 09th Av | unit 12: close a door, move entrance from kitcen to hallway. replace kitchen cabinetry. bring kitchen electrical & plumbing up to code. remodel bathroom busfloors & walls. replace sink & tub. bring bathroom up to plumbing code.Details
unit 12: close a door, move entrance from kitcen to hallway. replace kitchen cabinetry. bring kitchen electrical & plumbing up to code. remodel bathroom busfloors & walls. replace sink & tub. bring bathroom up to plumbing code. | $10,000 |
| Dec 13, 2012 | Completed final sign-off Apr 2014 | 120 Parker Av | renovation of apartment #301 & #304 - 2 bathroom & 2 kitchen remodel. add additional bathroom in each unitDetails
renovation of apartment #301 & #304 - 2 bathroom & 2 kitchen remodel. add additional bathroom in each unit | $60,000 |
| Sep 6, 2011 | Completed final sign-off Nov 2011 | 435 Locust St | adding bath to unit #3. converting 2 bed/1 bath to 2 bed and bath apartment.Details
adding bath to unit #3. converting 2 bed/1 bath to 2 bed and bath apartment. | $15,000 |
| Nov 23, 2010 | Completed final sign-off Sep 2011 | 988 Pine St | convert 1/2 bathroom to full bathroom. add 3rd bathroom, work on #988 only.Details
convert 1/2 bathroom to full bathroom. add 3rd bathroom, work on #988 only. | $33,834 |