Back to bathroom remodel contractors
F P Builders
- Based in
- Novato
- On San Francisco permits
- Oct 2004 to Jan 2019
- Last 24 months
- 0 permits filed
18 permits since 2000: 18 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2019 | Completed final sign-off Jun 2019 | 1317 Hyde St | apt #3: bathroom & powder room renovation, misc trim & millwork, reface (e) fire place surround. maher n/a.Details
apt #3: bathroom & powder room renovation, misc trim & millwork, reface (e) fire place surround. maher n/a. | $100,000 |
| Feb 18, 2014 | Completed final sign-off Jul 2014 | 749 Chestnut St | 1. remove & replace fixtures (bath 1 and bath 2) (in kind) 2. remove and replace cabinets and tops kitchen )in kind) 3. refinish wood floor, wall off existing fireplace 4. remove and replace (13) existing windows- clad inserts. same facing street (6) (in kind)Details
1. remove & replace fixtures (bath 1 and bath 2) (in kind) 2. remove and replace cabinets and tops kitchen )in kind) 3. refinish wood floor, wall off existing fireplace 4. remove and replace (13) existing windows- clad inserts. same facing street (6) (in kind) | $228,819 |
| Jan 6, 2014 | Completed final sign-off Apr 2014 | 101 Cortes Av | revision to 201311212563 - 1) remove and replace kitchen cabinets & countertops, & re-install appliances 2) remove and replace tile and plumbing fixtures in 2 guest baths - bath 2 & 3. to comply with cec150(k) 8 & 10Details
revision to 201311212563 - 1) remove and replace kitchen cabinets & countertops, & re-install appliances 2) remove and replace tile and plumbing fixtures in 2 guest baths - bath 2 & 3. to comply with cec150(k) 8 & 10 | $50,000 |
| Nov 21, 2013 | Completed final sign-off Apr 2014 | 101 Cortes Av | 1)replace extg tile floor with wood-family, office, power, hall, kitchen, sunroom at 1st floor. 2)remodel master bath(on 2nd floor)remove fire place, move heat duct at master bathroom. 3)enclose wall at den and add door.Details
1)replace extg tile floor with wood-family, office, power, hall, kitchen, sunroom at 1st floor. 2)remodel master bath(on 2nd floor)remove fire place, move heat duct at master bathroom. 3)enclose wall at den and add door. | $244,443 |
| Nov 15, 2012 | Completed final sign-off Dec 2015 | 3700 Broderick St | horizontal addition to rear on (2) levels, to north on (4) levels, and to west at (e) penthouse. interior renovation to (e) kitchen, renovate (3) (e) bathrooms, add new bathroom at ground flr. new elevator. fire sprinkler under separate permit.Details
horizontal addition to rear on (2) levels, to north on (4) levels, and to west at (e) penthouse. interior renovation to (e) kitchen, renovate (3) (e) bathrooms, add new bathroom at ground flr. new elevator. fire sprinkler under separate permit. | $500,000 |
| Apr 27, 2012 | Completed final sign-off Nov 2012 | 490 Avila St | kitchen remodel, new cabinets, counter update appliances, remove misc walls and dining room, update lighting in dining room. misc trim carpentry dining to sitting room. master bath replace bathtub and sink vanity.Details
kitchen remodel, new cabinets, counter update appliances, remove misc walls and dining room, update lighting in dining room. misc trim carpentry dining to sitting room. master bath replace bathtub and sink vanity. | $300,000 |
| Jan 28, 2011 | Completed final sign-off Apr 2011 | 490 Avila St | revision to pa# 2010.10.12.2716. add window bath#2 to match existing on 3rd floor visible from the street. remove and replace (e) radiant heatDetails
revision to pa# 2010.10.12.2716. add window bath#2 to match existing on 3rd floor visible from the street. remove and replace (e) radiant heat | $15,000 |
| Oct 12, 2010 | Completed final sign-off Jul 2011 | 490 Avila St | upper floor remodel: add 2 bathrooms & 2 bedrooms, misc partitoins within existing space, relocate existing sauna, revise lighting & electrical to accomodate new rooms, relocate (1) existing deck door.Details
upper floor remodel: add 2 bathrooms & 2 bedrooms, misc partitoins within existing space, relocate existing sauna, revise lighting & electrical to accomodate new rooms, relocate (1) existing deck door. | $150,000 |