F.M. Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Mar 2017
- Last 24 months
- 0 permits filed
30 permits since 2000: 14 completed, 4 never finaled, 12 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 160 days from filing to permit and 51 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2009 | Expired or cancelled expired Jan 2013 | 4120 22nd St | horizontal & vertical addition, to expand garage space south & east, to add a 3rd story to an existing 2 story build, scope to incl. 2 bathrms, 2 bedrooms, 3rd fl deck, new ext. stair. note: historic residential evaluation to planning on 12-8-09 c/o michael smith.Details
horizontal & vertical addition, to expand garage space south & east, to add a 3rd story to an existing 2 story build, scope to incl. 2 bathrms, 2 bedrooms, 3rd fl deck, new ext. stair. note: historic residential evaluation to planning on 12-8-09 c/o michael smith. | $82,000 |
| Feb 17, 2004 | Completed final sign-off Apr 2004 | 3084 Market St | inkind repair deck&staris.remove damage wood jiosts,decking.less than 50% replacement.Details
inkind repair deck&staris.remove damage wood jiosts,decking.less than 50% replacement. | $4,500 |