Back to bathroom remodel contractors
F.B. Development
- Based in
- Castro Valley
- On San Francisco permits
- Jul 2011 to Sep 2015
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2015 | Completed final sign-off Mar 2015 | 2147 Greenwich St | complete bathroom remodel, retile shower, replace vanity, toilet, tiles on the floor (64 sq ft). no walls, windows, doors under this scope.Details
complete bathroom remodel, retile shower, replace vanity, toilet, tiles on the floor (64 sq ft). no walls, windows, doors under this scope. | $10,000 |
| Jul 26, 2011 | Completed final sign-off Oct 2011 | 539 27th St | replace kitchen cabinets + aaa 4 recessed lights. replace shower and tub valves. retile install 2x exhaust bath fan. (1) kitchen & (2) bath remodelDetails
replace kitchen cabinets + aaa 4 recessed lights. replace shower and tub valves. retile install 2x exhaust bath fan. (1) kitchen & (2) bath remodel | $3,000 |