Back to bathroom remodel contractors
Extol Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Jul 2021
- Last 24 months
- 0 permits filed
32 permits since 2000: 26 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2021 | Completed final sign-off Apr 2022 | 1918 Pierce St | replace/remoddel 3 bathrooms in-kind. no (n) wall, no (e) wall relocation. (n) lighting shall comply w/ cec 150.0(k)3a(k)5Details
replace/remoddel 3 bathrooms in-kind. no (n) wall, no (e) wall relocation. (n) lighting shall comply w/ cec 150.0(k)3a(k)5 | $30,000 |
| Apr 27, 2021 | Expired or cancelled expired Jun 2025 | 65 Graystone Tr | replace kitchen and bathroom fixture in kind no structural , no framing modificationDetails
replace kitchen and bathroom fixture in kind no structural , no framing modification | $25,000 |
| Oct 15, 2020 | Completed final sign-off Nov 2021 | 1818 20th St | kitchen and bathroom remodel in kind, replace cabinet, sink and flooringDetails
kitchen and bathroom remodel in kind, replace cabinet, sink and flooring | $20,000 |
| Oct 8, 2015 | Completed final sign-off Jan 2016 | 246 28th Av | convert 2nd flr closet into bathroom at front. remove (e) powder room at backDetails
convert 2nd flr closet into bathroom at front. remove (e) powder room at back | $10,000 |
| Sep 18, 2015 | Completed final sign-off Jul 2016 | 562 40th Av | add shower to extg permited bath. no structural modification. work at rear. not inlaw or dwelling unit. no change of use, existing storage to remain.Details
add shower to extg permited bath. no structural modification. work at rear. not inlaw or dwelling unit. no change of use, existing storage to remain. | $3,000 |
| Aug 13, 2015 | Completed final sign-off Dec 2018 | 1333 Jones St | re-fixturing of one kitchen and two bathrooms. re-tiling of bathrooms. all non structural work. n/a ordinance #155-13Details
re-fixturing of one kitchen and two bathrooms. re-tiling of bathrooms. all non structural work. n/a ordinance #155-13 | $40,000 |
| Jul 24, 2015 | Never finaled issued Aug 2015, no final | 65 Lippard Av | relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg.Details
relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg. | $140,000 |
| Jun 9, 2015 | Completed final sign-off May 2016 | 562 40th Av | bathroom remodel, replace in kind,new electric & new plumbing, install bathroom vent/fan, sheetrock and tile,no structural work ,same configuration.Details
bathroom remodel, replace in kind,new electric & new plumbing, install bathroom vent/fan, sheetrock and tile,no structural work ,same configuration. | $10,800 |
| Mar 27, 2015 | Completed final sign-off Oct 2017 | 428 Collingwood St | horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage levelDetails
horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage level | $190,000 |
| Feb 27, 2015 | Completed final sign-off Oct 2015 | 1870 Jackson St | unit #403: kitchen and 2 bathroom remodel with electrical and plumbing to be included. kitchen replace cabinets, new lighting and replace fixtures. bathroom new lighting and replace fixtures and tiling. no structural work.Details
unit #403: kitchen and 2 bathroom remodel with electrical and plumbing to be included. kitchen replace cabinets, new lighting and replace fixtures. bathroom new lighting and replace fixtures and tiling. no structural work. | $45,000 |
| Aug 18, 2014 | Completed final sign-off May 2023 | 2070 Ellis St | proposal for a rear horiz + vert addition (890 sf) to an (e) residence.1st flr: (n) foundation @ rear + structural reinforcement. 2nd flr: (n) stair case, change nursery to home office. 3rd flr: new 2 bedrooms, 1 bathroom,roof deck. 750 sf living, 140 sf roof deck.Details
proposal for a rear horiz + vert addition (890 sf) to an (e) residence.1st flr: (n) foundation @ rear + structural reinforcement. 2nd flr: (n) stair case, change nursery to home office. 3rd flr: new 2 bedrooms, 1 bathroom,roof deck. 750 sf living, 140 sf roof deck. | $175,000 |