Excell Construction
- Based in
- Kirkland
- On San Francisco permits
- Apr 2015 to Jul 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2015 | Never finaled issued Mar 2016, no final | 390 Clementina St | t-mobile install (3) new 8'-0" panel antennas on new (e) antenna mounts adjacent to (e) panel antennas. install (3) new ericsson rrus-11s adjacent to new panel antennas. replace (e) dul20 w/new dus41 main unit in (e) equipment cabinet. lower gps antenna. refuse (e) fcs cables.Details
t-mobile install (3) new 8'-0" panel antennas on new (e) antenna mounts adjacent to (e) panel antennas. install (3) new ericsson rrus-11s adjacent to new panel antennas. replace (e) dul20 w/new dus41 main unit in (e) equipment cabinet. lower gps antenna. refuse (e) fcs cables. | $20,000 |
| Apr 27, 2015 | Completed final sign-off Jul 2017 | 810 Battery St | modify t-mobile existing cell site on roof mod involves; instal 3 antennas, 6 existing remain. relocate 2 antennas from sector a to penthouse wall, install 3 new rrvs at (n) ant, frd wall over antennas to screen from view paint wall to match exist bldg penthouse. maher ordinance exten is not comply.Details
modify t-mobile existing cell site on roof mod involves; instal 3 antennas, 6 existing remain. relocate 2 antennas from sector a to penthouse wall, install 3 new rrvs at (n) ant, frd wall over antennas to screen from view paint wall to match exist bldg penthouse. maher ordinance exten is not comply. | $20,000 |