Back to bathroom remodel contractors
Excel Site Services Inc
- Based in
- South San Francisco
- On San Francisco permits
- Nov 2004 to Jul 2026
- Last 24 months
- 2 permits filed
22 permits since 2000: 12 completed, 2 in progress, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 370 days from filing to permit and 922 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 875 Grove St | units 875 and 879: all work interior, remove kitchen cabinets and drywall, remove bathroom tiles, remove drywall, fixtures. demo only. seperate permits to be pulled for remodels. demo only.Details
units 875 and 879: all work interior, remove kitchen cabinets and drywall, remove bathroom tiles, remove drywall, fixtures. demo only. seperate permits to be pulled for remodels. demo only. | $16,000 |
| Nov 18, 2021 | Completed final sign-off Jan 2025 | 400 Teresita Bl | 1,000 sf remodel with 90 sf lightwell infill at rear of building. build replacement 350 sf gable roof over lightwell infill area and existing rear of building. locate new bedrooms, remodel & expand (e) kitchen, remodel 2 (e) bathrooms and +1 (n) powder room. rear & side facade work: replace windowsDetails
1,000 sf remodel with 90 sf lightwell infill at rear of building. build replacement 350 sf gable roof over lightwell infill area and existing rear of building. locate new bedrooms, remodel & expand (e) kitchen, remodel 2 (e) bathrooms and +1 (n) powder room. rear & side facade work: replace windows | $200,000 |
| Mar 12, 2020 | Completed final sign-off Aug 2023 | 66 Calhoun Tr | foundation work @ rear yard. interior alterations and shear wall work. remodel 2 kitchens and 1 bath. demo existing rear yard spiral stair. replace w/ new spiral metal stair (<10' high, from yard up to 1st habitable level & within buildable area.)Details
foundation work @ rear yard. interior alterations and shear wall work. remodel 2 kitchens and 1 bath. demo existing rear yard spiral stair. replace w/ new spiral metal stair (<10' high, from yard up to 1st habitable level & within buildable area.) | $335,000 |
| Jul 31, 2017 | Completed final sign-off Mar 2024 | 358 Lombard St | interior renovation with horizontal and vertical addition. 2 new additional bedrooms & 3.5 new additional bathrooms.Details
interior renovation with horizontal and vertical addition. 2 new additional bedrooms & 3.5 new additional bathrooms. | $550,000 |
| Aug 31, 2015 | Completed final sign-off Dec 2017 | 550 Laidley St | remodel of (e) single family residence. (n) habitable space @ 1st fl. horizontal addition @ front. vertical addition. remodel kitchen & bath.Details
remodel of (e) single family residence. (n) habitable space @ 1st fl. horizontal addition @ front. vertical addition. remodel kitchen & bath. | $250,000 |