Back to bathroom remodel contractors
Eversound Development
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Mar 2007
- Last 24 months
- 0 permits filed
48 permits since 2000: 36 completed, 4 never finaled, 8 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 213 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2007 | Completed final sign-off Aug 2007 | 176 Evelyn Wy | 1)remodel extg kchn, bathroom, added new bath room at 1st floor. 2)2 bed room, one bathroom and family room to be added at ground floor. 3) const. new deck at rearDetails
1)remodel extg kchn, bathroom, added new bath room at 1st floor. 2)2 bed room, one bathroom and family room to be added at ground floor. 3) const. new deck at rear | $60,000 |
| Jan 19, 2006 | Completed final sign-off Nov 2007 | 450 21st Av | ground floor: add a unit(unit a) hallway, dining room,kchn, livingroom, 1 bath,1 bedrm, 2nd flr: add a family room at rear,convert (e) bdrm to entertmnt rm, convert ex bth to nook,removal kchn. 3rd floor remodel (e) master bdrm, convert (e) kchn to master bthrm & a sitting room and roofdeck,Details
ground floor: add a unit(unit a) hallway, dining room,kchn, livingroom, 1 bath,1 bedrm, 2nd flr: add a family room at rear,convert (e) bdrm to entertmnt rm, convert ex bth to nook,removal kchn. 3rd floor remodel (e) master bdrm, convert (e) kchn to master bthrm & a sitting room and roofdeck, | $200,000 |
| Aug 1, 2005 | Completed final sign-off Mar 2006 | 71 Canyon Dr | 1 bedroom, family room & full bathroom to be added at ground floor.Details
1 bedroom, family room & full bathroom to be added at ground floor. | $22,000 |
| Jan 14, 2005 | Completed final sign-off Aug 2005 | 111 Springfield Dr | add a bathroom on the 2nd floor, add a bathroom, two bedrooms and a family room on the ground floorDetails
add a bathroom on the 2nd floor, add a bathroom, two bedrooms and a family room on the ground floor | $100,000 |
| Aug 2, 2004 | Never finaled issued Aug 2004, no final | 975 Girard St | dry rot repair front & back wall/decks,remodel kitchen & bath,cabinet,flooring,sinks,tubs,toilet &Details
dry rot repair front & back wall/decks,remodel kitchen & bath,cabinet,flooring,sinks,tubs,toilet & | $40,000 |
| Sep 16, 2003 | Completed final sign-off Apr 2004 | 11 Eugenia Av | remodeling of kitchen & bath as per plans. replace front windows & repair front stair. add bathroomDetails
remodeling of kitchen & bath as per plans. replace front windows & repair front stair. add bathroom | $30,000 |
| Sep 8, 2003 | Expired or cancelled expired Dec 2004 | 11 Eugenia Av | remodeling of bathroom upstair only.Details
remodeling of bathroom upstair only. | $5,000 |
| Oct 3, 2001 | Completed final sign-off May 2002 | 842 43rd Av | add new bedroom, social room, bath rooms at basement, remodel kitchen & bathroomsDetails
add new bedroom, social room, bath rooms at basement, remodel kitchen & bathrooms | $25,000 |
| Sep 14, 2001 | Completed final sign-off Feb 2002 | 4834 19th St | remodel kitchen 2nd floor, add new half bath.Details
remodel kitchen 2nd floor, add new half bath. | $51,350 |
| Aug 3, 2000 | Expired or cancelled expired Feb 2001 | 952 Clement St | kitchen remodel, bathroom, replace tiles & fixtures, paint int. & ext., install sheetrockDetails
kitchen remodel, bathroom, replace tiles & fixtures, paint int. & ext., install sheetrock | $8,000 |