Back to bathroom remodel contractors
Everbuilt Construction, Inc.
- Based in
- Kentfield
- On San Francisco permits
- Mar 2000 to Dec 2018
- Last 24 months
- 0 permits filed
58 permits since 2000: 55 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2018 | Completed final sign-off Dec 2021 | 2749 Steiner St | horizontal addition at rear. convert exterior entry to interior entry foyer. renovate kitchen. relocate landry room. renovate 2 bathrooms at 3rd floor.Details
horizontal addition at rear. convert exterior entry to interior entry foyer. renovate kitchen. relocate landry room. renovate 2 bathrooms at 3rd floor. | $100,000 |
| Dec 19, 2017 | Completed final sign-off May 2018 | 3553 Divisadero St | remodel extg bathroom, remove extg finishes and fixtures, add shower stall, add lighting, new heat radiant floor mat. install owner suppled fixtures and finishes. n/a for maher.Details
remodel extg bathroom, remove extg finishes and fixtures, add shower stall, add lighting, new heat radiant floor mat. install owner suppled fixtures and finishes. n/a for maher. | $72,000 |
| Jun 27, 2014 | Completed final sign-off Dec 2015 | 2755 Steiner St | horizontal at rear; 3 story addition, 120 sq. ft. at 3 stories. revise staircase at rear, interior remodel: kitchen, baths, misc. reduced scope of work 02/12/15: bay window addition at rear wall. new windows at rear wall, interior remodel-kitchen and baths.Details
horizontal at rear; 3 story addition, 120 sq. ft. at 3 stories. revise staircase at rear, interior remodel: kitchen, baths, misc. reduced scope of work 02/12/15: bay window addition at rear wall. new windows at rear wall, interior remodel-kitchen and baths. | $235,000 |
| Jul 27, 2012 | Completed final sign-off Sep 2012 | 1083 Clay St | partial removal kitchen: replace counter tops, remove 1 upper cabinet, replace 1 cabt above refrig, one bath room, remodel & replace (e) tub with shower, new cabinet & counter top, misc electrical. no change in wall & opening layout. bedroom & living room - misc electrical lighting.Details
partial removal kitchen: replace counter tops, remove 1 upper cabinet, replace 1 cabt above refrig, one bath room, remodel & replace (e) tub with shower, new cabinet & counter top, misc electrical. no change in wall & opening layout. bedroom & living room - misc electrical lighting. | $28,500 |
| Jul 14, 2011 | Completed final sign-off Dec 2011 | 723 37th Av | no exterior work. remove wood post and beams at garage level, replace with steel beams on wood post. provide bracing for existing masonry entry stair. remodel extg master bathroom at upper level. provide bracing for existing masonry entry stair.Details
no exterior work. remove wood post and beams at garage level, replace with steel beams on wood post. provide bracing for existing masonry entry stair. remodel extg master bathroom at upper level. provide bracing for existing masonry entry stair. | $60,000 |
| Mar 9, 2011 | Completed final sign-off Nov 2011 | 211 Belgrave Av | remodel existing storage spaces @ 1st floor into new bedroom & bathroom, remodel existing bathroom, new durnace to serve 1st floor & existing furnace to serve on 2nd floor. interior alterations only, no work at exterior.Details
remodel existing storage spaces @ 1st floor into new bedroom & bathroom, remodel existing bathroom, new durnace to serve 1st floor & existing furnace to serve on 2nd floor. interior alterations only, no work at exterior. | $48,000 |
| Feb 9, 2006 | Completed final sign-off Sep 2006 | 1804 Broadway | upgrade master bath: remove & replace wall coverings as require. remove & replace all fixtures, install new drywall tile, + paint no changes to partitions on exterior windows.Details
upgrade master bath: remove & replace wall coverings as require. remove & replace all fixtures, install new drywall tile, + paint no changes to partitions on exterior windows. | $17,500 |