Back to bathroom remodel contractors
European Enterprises
- Based in
- Belmont
- On San Francisco permits
- Feb 2000 to Jun 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2018 | Completed final sign-off Mar 2019 | 2261 Francisco St | 3rd flr unit -interior remodel: remove laundry room create bathroom. remodel (e) bathroom and kitchen remove walls between kitchen and parlor and parlor and dining roomDetails
3rd flr unit -interior remodel: remove laundry room create bathroom. remodel (e) bathroom and kitchen remove walls between kitchen and parlor and parlor and dining room | $25,000 |
| Nov 23, 2015 | Completed final sign-off Apr 2016 | 505 Beach St | #131- legalize per request of dph: 1 bath with shower, 1 sink, cabinets & dishwasher in breakroom installed 30 years ago, change of use to massage establishment per code section 177 for legitimzation, use first established july 10, 2014. n/a ordinance #155-13Details
#131- legalize per request of dph: 1 bath with shower, 1 sink, cabinets & dishwasher in breakroom installed 30 years ago, change of use to massage establishment per code section 177 for legitimzation, use first established july 10, 2014. n/a ordinance #155-13 | $5,000 |
| Mar 7, 2006 | Completed final sign-off Oct 2006 | 263 Claremont Bl | to remodel extg 3rd floor bath room per plan and close extg 2 1/2 x 2 1/2 light wellDetails
to remodel extg 3rd floor bath room per plan and close extg 2 1/2 x 2 1/2 light well | $6,500 |
| Jun 14, 2005 | Completed final sign-off Oct 2005 | 2125 Rivera St | remodel kitchen and 1 bath, all appliances stay at same place, upgrade cabinets, sinks, tub, shower.Details
remodel kitchen and 1 bath, all appliances stay at same place, upgrade cabinets, sinks, tub, shower. | $6,500 |
| Jun 17, 2003 | Never finaled issued Jun 2003, no final | 662 Elizabeth St | replace bathroom faucets. install 220v for dryer, new lights and fan. new tiles and bathroom door. rDetails
replace bathroom faucets. install 220v for dryer, new lights and fan. new tiles and bathroom door. r | $6,730 |