Back to bathroom remodel contractors
Eurocraft Construciton
- Based in
- San Francisco
- On San Francisco permits
- Aug 2003 to Jun 2015
- Last 24 months
- 0 permits filed
30 permits since 2000: 22 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 83 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2009 | Completed final sign-off Sep 2009 | 790 Myra Wy | repair dry rot / termite damage rerock & re-insulate due to rodent infestation. replace kitchen / bathroom fixtures & fittings. repair damaged framing & original electrical & plumbing & bring up to code.Details
repair dry rot / termite damage rerock & re-insulate due to rodent infestation. replace kitchen / bathroom fixtures & fittings. repair damaged framing & original electrical & plumbing & bring up to code. | $30,000 |
| May 2, 2008 | Completed final sign-off Jul 2008 | 2409 Green St | cosmetic bathroom remodel. remove existing wall coverings + fixtures replace with new. change window (e) to double glaze same size retile to finish.Details
cosmetic bathroom remodel. remove existing wall coverings + fixtures replace with new. change window (e) to double glaze same size retile to finish. | $6,400 |
| Oct 31, 2006 | Never finaled issued Oct 2006, no final | 169 Crestmont Dr | remodel existing ground floor bathroom. remove existing floor, ceiling + wall coverings, insulate as necessary, re-rock, retile cosmetic remodel (no chnages to partitions or windows).Details
remodel existing ground floor bathroom. remove existing floor, ceiling + wall coverings, insulate as necessary, re-rock, retile cosmetic remodel (no chnages to partitions or windows). | $18,700 |
| Jul 17, 2006 | Completed final sign-off Oct 2006 | 160 29th Av | bathroom remodel remove existing coverings to framing upgrade electrical/plumbing for new confiquration insulate, rerock to finish cosmetic makeover, no structural, replacement in kind.Details
bathroom remodel remove existing coverings to framing upgrade electrical/plumbing for new confiquration insulate, rerock to finish cosmetic makeover, no structural, replacement in kind. | $27,500 |
| Oct 12, 2005 | Completed final sign-off Nov 2005 | 2409 Green St | add additional cosmetic detail to (e) decorative cornice (front). replace one dryrot wood sash with new wood sash (bathroom window).Details
add additional cosmetic detail to (e) decorative cornice (front). replace one dryrot wood sash with new wood sash (bathroom window). | $6,750 |