Back to bathroom remodel contractors
Eugene Murphy Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2026
- Last 24 months
- 2 permits filed
43 permits since 2000: 27 completed, 1 in progress, 9 never finaled, 6 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 1471 05th Av | bathroom remodel in kind- replace tub with new tub like for like, remove vanity and replace like for like, replace tiles and sheetrock in bathroom in kind, replace bathroom fan and lights. replacement sheetrock to be 5/8" type x gypbd w/ 5d cooler nails @ 4" o.c. or equivalent. no structural work.Details
bathroom remodel in kind- replace tub with new tub like for like, remove vanity and replace like for like, replace tiles and sheetrock in bathroom in kind, replace bathroom fan and lights. replacement sheetrock to be 5/8" type x gypbd w/ 5d cooler nails @ 4" o.c. or equivalent. no structural work. | $25,000 |
| Jul 9, 2013 | Completed final sign-off Dec 2013 | 380 14th St | remodel kitchen/bath (kit) countertop, sink, cabinets, (bath) vanity, toilet, remove tub repipe with walk in shower (no lighting)Details
remodel kitchen/bath (kit) countertop, sink, cabinets, (bath) vanity, toilet, remove tub repipe with walk in shower (no lighting) | $12,000 |
| Nov 30, 2012 | Completed final sign-off Feb 2013 | 553 27th Av | #201: replace dry rot in apt bathroom (shower pan) replace tiles around showerDetails
#201: replace dry rot in apt bathroom (shower pan) replace tiles around shower | $5,000 |
| Jan 2, 2002 | Completed final sign-off Mar 2002 | 49 Niagara Av | repair dry rot in floor and wall of bathroom water closet install vanity tub & toilet in bathroom reDetails
repair dry rot in floor and wall of bathroom water closet install vanity tub & toilet in bathroom re | $15,500 |
| Mar 12, 2001 | Completed final sign-off May 2001 | 1434 Hyde St | remove tile & sheetrock from wall of bathroomDetails
remove tile & sheetrock from wall of bathroom | $15,000 |
| Aug 30, 2000 | Expired or cancelled expired Dec 2000 | 930 Elizabeth St | repair dry rot in framing in exterior wall of bathrooms unit 3 & 4, replace windows, tile tub-showerDetails
repair dry rot in framing in exterior wall of bathrooms unit 3 & 4, replace windows, tile tub-shower | $4,500 |