Back to bathroom remodel contractors
Estland Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Mar 2022
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2020 | Completed final sign-off Nov 2020 | 1290 Rhode Island St | hall bathroom: el. floor heating, tub, fixtures, tile. master bathroom: el floor heating, shower pan, tile, fixtures. new engineered wood floors on other areas. water damaged drywall repairs in two bedrooms and hallway due to flooring. use 5/8 type "x" drywallDetails
hall bathroom: el. floor heating, tub, fixtures, tile. master bathroom: el floor heating, shower pan, tile, fixtures. new engineered wood floors on other areas. water damaged drywall repairs in two bedrooms and hallway due to flooring. use 5/8 type "x" drywall | $24,000 |
| Jan 25, 2019 | Expired or cancelled cancelled Jan 2020 | 1290 Rhode Island St | amend 201712085923 for additional work: bathroom remodel: new toilet, bathrub, fixtures, faucets & tile.Details
amend 201712085923 for additional work: bathroom remodel: new toilet, bathrub, fixtures, faucets & tile. | $12,000 |
| Apr 23, 2018 | Completed final sign-off Jan 2019 | 1001 Lincoln Wy | kitchen and bathroom remodel, new central heating by different contractor. no structural workDetails
kitchen and bathroom remodel, new central heating by different contractor. no structural work | $50,000 |
| Jan 5, 2016 | Completed final sign-off Feb 2016 | 440 Valley St | unit #1: one kitchen and one bathroom remodel. no structural workDetails
unit #1: one kitchen and one bathroom remodel. no structural work | $32,469 |
| Jul 25, 2011 | Completed final sign-off Sep 2011 | 440 Valley St | unit #4-replace kitchen cabinets, tile the floor, tile bathroom floor & wallsDetails
unit #4-replace kitchen cabinets, tile the floor, tile bathroom floor & walls | $18,200 |
| May 20, 2010 | Completed final sign-off Aug 2010 | 1378 06th Av | kitchen & bathroom remodel, updated electrical, re-pipe iron plumbing to copper, install (n) kitchen cabinets.Details
kitchen & bathroom remodel, updated electrical, re-pipe iron plumbing to copper, install (n) kitchen cabinets. | $15,000 |