Estevez Construction
- Based in
- Oakley
- On San Francisco permits
- Jun 2018 to Oct 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2019 | Completed final sign-off Jun 2019 | 70 Heather Av | remove and replace in kind shower, vanity, toilet, tile. replace kitchen cabinets and counter add outlets per side 1 kitchen 1 bath, non strucDetails
remove and replace in kind shower, vanity, toilet, tile. replace kitchen cabinets and counter add outlets per side 1 kitchen 1 bath, non struc | $22,750 |
| Nov 5, 2018 | Completed final sign-off Jan 2020 | 1382 33rd Av | 2nd fl: remodel bathroom including moving of plumbing fixtures.Details
2nd fl: remodel bathroom including moving of plumbing fixtures. | $30,000 |
| Jun 12, 2018 | Completed final sign-off Jan 2019 | 2121 Taylor St | (1) bathroom remodel: new tub, shower, toilet, vanity, tiles, fan and r.l. in kind, same location. no moving of doors or walls.Details
(1) bathroom remodel: new tub, shower, toilet, vanity, tiles, fan and r.l. in kind, same location. no moving of doors or walls. | $8,000 |