Back to bathroom remodel contractors
Estate Maintenance Services
- Based in
- Tracy
- On San Francisco permits
- Jun 2014 to Sep 2014
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 0 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2014 | Never finaled issued Sep 2014, no final | 4411 23rd St | bathroom remodel - change for like tub, sink, tile wall @ unit #4411.Details
bathroom remodel - change for like tub, sink, tile wall @ unit #4411. | $9,037 |
| Aug 11, 2014 | Completed final sign-off Apr 2015 | 1523 Kirkwood Av | bathroom on 2/f: bathroom remodel-replace tub, vanity, toilet, add gfci in same location, no structural work.Details
bathroom on 2/f: bathroom remodel-replace tub, vanity, toilet, add gfci in same location, no structural work. | $9,000 |
| Jun 6, 2014 | Never finaled issued Jun 2014, no final | 83 Elsie St | changing tub and vanity. bathroom remodeling.Details
changing tub and vanity. bathroom remodeling. | $2,500 |