Back to bathroom remodel contractors
Estate Builders Inc.
- Based in
- Antioch
- On San Francisco permits
- Feb 2005 to Aug 2025
- Last 24 months
- 2 permits filed
20 permits since 2000: 12 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 6 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 373 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2025 | Completed final sign-off Sep 2026 | 254 Laussat St | bathroom remodel. like for like. 40 sq. ft.Details
bathroom remodel. like for like. 40 sq. ft. | $28,192 |
| May 28, 2019 | Completed final sign-off May 2022 | 475 Vallejo St | remodel extg kitchen in same location. remodel extg bath in same location. remodel extg bedroom and office in same location.Details
remodel extg kitchen in same location. remodel extg bath in same location. remodel extg bedroom and office in same location. | $150,000 |
| Oct 23, 2017 | Completed final sign-off Feb 2019 | 1340 Clay St | remodel kitchen in place-no structural; remodel bath in place-no structural; remove non-structural wall; move (1) fire sprinkler head under separate permit. maher naDetails
remodel kitchen in place-no structural; remodel bath in place-no structural; remove non-structural wall; move (1) fire sprinkler head under separate permit. maher na | $100,000 |
| Sep 26, 2017 | Expired or cancelled expired Oct 2025 | 191 Upper Tr | remodel 2 e bathrooms in e locations. reconfigure 2 closets. no structuralDetails
remodel 2 e bathrooms in e locations. reconfigure 2 closets. no structural | $25,000 |
| Aug 22, 2017 | Completed final sign-off Aug 2018 | 2861 Clay St | new tile floor in powder room, bew tile floor in hall bath, new tile & fixtures in master bathDetails
new tile floor in powder room, bew tile floor in hall bath, new tile & fixtures in master bath | $10,000 |
| May 11, 2017 | Expired or cancelled expired Apr 2026 | 3920 Sacramento St | remodel (2) bathrooms in existing locations, no structural work.Details
remodel (2) bathrooms in existing locations, no structural work. | $15,000 |
| Jan 25, 2017 | Never finaled issued Jan 2017, no final | 3320 Jackson St | bathroom #1-remove (e) bathtub & tile, replace with new. bathroom #2- remove (e) tile & countertop, replace with new. bathroom #3-relocate toilet. new vanityDetails
bathroom #1-remove (e) bathtub & tile, replace with new. bathroom #2- remove (e) tile & countertop, replace with new. bathroom #3-relocate toilet. new vanity | $25,000 |
| May 3, 2006 | Completed final sign-off Sep 2006 | 767 Rhode Island St | master bathroom remodel: (n) fixtures & fittings @ (e) locations, (n) tile @floor & shower; (n) stone slab @ tub deck; (n) vanity cabinets & stone slab top.Details
master bathroom remodel: (n) fixtures & fittings @ (e) locations, (n) tile @floor & shower; (n) stone slab @ tub deck; (n) vanity cabinets & stone slab top. | $65,000 |
| Feb 3, 2006 | Expired or cancelled expired Jan 2008 | 2375 Broadway | 2nd floor remodel. master bath, dressing rm, guest bath. historical building per attached documentDetails
2nd floor remodel. master bath, dressing rm, guest bath. historical building per attached document | $250,000 |
| Feb 7, 2005 | Completed final sign-off Sep 2005 | 2640 Steiner St | kitchen remodel, add 1/2 bath in (e) kitchen pantry,plumbing,electricalDetails
kitchen remodel, add 1/2 bath in (e) kitchen pantry,plumbing,electrical | $100,000 |