Back to bathroom remodel contractors
Eris General Construction Inc.
- Based in
- Oakland
- On San Francisco permits
- Apr 2006 to Aug 2008
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2007 | Expired or cancelled expired Dec 2008 | 1870 Jackson St | replacing the tiles in the bathroom, replacing the faucet in the bathroomDetails
replacing the tiles in the bathroom, replacing the faucet in the bathroom | $1,250 |
| May 14, 2007 | Completed final sign-off Sep 2007 | 100 Pierce St | add 1/2 bath to 1st level bedroom in unit 100 pierce only.Details
add 1/2 bath to 1st level bedroom in unit 100 pierce only. | $4,500 |
| Apr 14, 2006 | Completed final sign-off May 2006 | 1390 South Van Ness Av | installing new replacing old one kitchen cabinets, (2) bathrooms, removing linoleum and install ceramic tiles, (2) bathrooms, removing old cabinets and install new oneDetails
installing new replacing old one kitchen cabinets, (2) bathrooms, removing linoleum and install ceramic tiles, (2) bathrooms, removing old cabinets and install new one | $21,000 |