Back to bathroom remodel contractors
Erick's Construction Inc
- Based in
- San Jose
- On San Francisco permits
- Jan 2008 to Mar 2018
- Last 24 months
- 0 permits filed
20 permits since 2000: 15 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2016 | Completed final sign-off Sep 2016 | 601 Van Ness Av | remodel 1 bathroom. install new led recessed lights in bedroom and living room. install new hardwood floor on the hallway.Details
remodel 1 bathroom. install new led recessed lights in bedroom and living room. install new hardwood floor on the hallway. | $12,000 |
| Feb 25, 2016 | Completed final sign-off Sep 2016 | 601 Van Ness Av | remodel two bathrooms. kitchen remodel. replacing kitchen cabinets. install new recessed lights in bedrooms and livingroom. install new hardwood floor on the hallway.Details
remodel two bathrooms. kitchen remodel. replacing kitchen cabinets. install new recessed lights in bedrooms and livingroom. install new hardwood floor on the hallway. | $39,000 |
| Dec 23, 2013 | Completed final sign-off Jul 2014 | 336 Gold Mine Dr | remodel 3 bathrooms, replace kitchen counter top, replace kitchen appliances, install new recessed lighting fixtures. replace windows, replace interior doors, relocate walk-in closet & bathroom walls.Details
remodel 3 bathrooms, replace kitchen counter top, replace kitchen appliances, install new recessed lighting fixtures. replace windows, replace interior doors, relocate walk-in closet & bathroom walls. | $36,000 |
| Jun 1, 2010 | Completed final sign-off Jul 2010 | 338 Spear St | unit 35-d on the 35th floor. new electrical fixtures, replace kitchen island, new bathroom cabinets, painting. no structural work/now wall relocation.Details
unit 35-d on the 35th floor. new electrical fixtures, replace kitchen island, new bathroom cabinets, painting. no structural work/now wall relocation. | $13,000 |
| Aug 26, 2009 | Completed final sign-off Oct 2009 | 66 Cleary Ct | remodel of existing master bathroom. new floor tiles and wall tiles. existing w.c and lav to remain. new tempered sliding glass doors and showers. new water proof liner and shower base. work on 11th floor.Details
remodel of existing master bathroom. new floor tiles and wall tiles. existing w.c and lav to remain. new tempered sliding glass doors and showers. new water proof liner and shower base. work on 11th floor. | $4,000 |
| Sep 11, 2008 | Never finaled issued Sep 2008, no final | 10 Miller Pl | interior remodel of extg residence, new kitchen cabinets, new tiles in extg bathrooms, new hardwood flooring, new doors, new recessed light fixtures.Details
interior remodel of extg residence, new kitchen cabinets, new tiles in extg bathrooms, new hardwood flooring, new doors, new recessed light fixtures. | $25,000 |
| Mar 5, 2008 | Completed final sign-off Aug 2008 | 21 Ora Wy | interior remodel- kitchen and bathrooms cabinets, new counters, wall finsihes, entry door,hardwood floor refinishing and painting, and new windows replacement in kind, and replace (e) aluminium frame to vinyl clad of front patio.Details
interior remodel- kitchen and bathrooms cabinets, new counters, wall finsihes, entry door,hardwood floor refinishing and painting, and new windows replacement in kind, and replace (e) aluminium frame to vinyl clad of front patio. | $50,000 |