Back to bathroom remodel contractors
Eric Peoro
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Jun 2022
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 616 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2022 | Completed final sign-off Dec 2024 | 2999 California St | unit #301: one kitchen and one bathroom remodel in-kind.Details
unit #301: one kitchen and one bathroom remodel in-kind. | $65,000 |
| Dec 3, 2021 | Expired or cancelled cancelled Oct 2024 | 2999 California St | unit 204: install recessed lights, receptacles and switches. replace existing bathroom wall tile with new, replace toilet, sink, and medicine cabinet with new. upgrade sub panel to accommodate new electrical.Details
unit 204: install recessed lights, receptacles and switches. replace existing bathroom wall tile with new, replace toilet, sink, and medicine cabinet with new. upgrade sub panel to accommodate new electrical. | $14,500 |
| Jun 3, 2015 | Completed final sign-off Apr 2016 | 1436 Grove St | remodel extg unit interiors (3 baths and 3 bedrooms). new storage area. repair at extg west wall. new windows at east west and north. structural, mech, and electrical plans.Details
remodel extg unit interiors (3 baths and 3 bedrooms). new storage area. repair at extg west wall. new windows at east west and north. structural, mech, and electrical plans. | $125,000 |
| Jul 10, 2007 | Expired or cancelled expired Feb 2009 | 35 Carver St | build new family room & bathroom on ground floor with new french door. voluntary groung floor strenthening.Details
build new family room & bathroom on ground floor with new french door. voluntary groung floor strenthening. | $40,000 |