Back to bathroom remodel contractors
Eric Palmer
- Based in
- Mill Valley
- On San Francisco permits
- Jan 2005 to Jan 2022
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2022 | Never finaled issued Oct 2022, no final | 128 Caine Av | to comply with violation 201903721, convert an existing permitted study room and bath to an adu unit at the first floor under the state adu program.Details
to comply with violation 201903721, convert an existing permitted study room and bath to an adu unit at the first floor under the state adu program. | $70,000 |
| Sep 24, 2012 | Completed final sign-off Jan 2013 | 5 07th Av | remodel 2/f bathroom new supply line and vent for washer/dryer, new vanity, sink, toilet and tub/shower, installation of fan/vent over tub/shower and light, possible relocation of toilet waste & tub drain, no structural changes, bathroom, size 7'x7'5".Details
remodel 2/f bathroom new supply line and vent for washer/dryer, new vanity, sink, toilet and tub/shower, installation of fan/vent over tub/shower and light, possible relocation of toilet waste & tub drain, no structural changes, bathroom, size 7'x7'5". | $10,000 |
| Sep 26, 2008 | Completed final sign-off Dec 2008 | 155 Clipper St | the existing bathroom to be remodeled in kind, replace vanity, shower. no plumbing to be moved. a new pressure balance valve to be installed & a new shower pan to be constructed. nov 200843521-ces.Details
the existing bathroom to be remodeled in kind, replace vanity, shower. no plumbing to be moved. a new pressure balance valve to be installed & a new shower pan to be constructed. nov 200843521-ces. | $15,000 |