Back to bathroom remodel contractors
Emi Design & Construction, Inc
- Based in
- San Mateo
- On San Francisco permits
- Feb 2014 to Nov 2015
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 7 days from filing to permit and 338 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2015 | Never finaled issued Aug 2015, no final | 65 Lippard Av | relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg.Details
relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg. | $140,000 |
| Jul 22, 2015 | Completed final sign-off Nov 2016 | 512 Nevada St | remodel 3 bedroom, 3 bathroom, replace sheetrock, kitchen chnage wire and pipe, new furnace, water heater, repair brick house patio, 200a panelDetails
remodel 3 bedroom, 3 bathroom, replace sheetrock, kitchen chnage wire and pipe, new furnace, water heater, repair brick house patio, 200a panel | $85,000 |
| Jun 30, 2015 | Completed final sign-off Apr 2016 | 519 Nevada St | remodel whole house interest. repair termite/dryrot damage. replace all window and door. remodel 2 bedroom, 2 1/2 bathroom. per complaint # 201553731. repair work only no building foot print expansion under this permit. no work visible from street.Details
remodel whole house interest. repair termite/dryrot damage. replace all window and door. remodel 2 bedroom, 2 1/2 bathroom. per complaint # 201553731. repair work only no building foot print expansion under this permit. no work visible from street. | $80,000 |
| Mar 11, 2015 | Completed final sign-off Apr 2016 | 519 Nevada St | remodel kitchen and 2 bathrooms. change wire and pipe. new furnace. sheet rock and paint. back deck repair and stair way. less than 50%)Details
remodel kitchen and 2 bathrooms. change wire and pipe. new furnace. sheet rock and paint. back deck repair and stair way. less than 50%) | $6,500 |
| Oct 15, 2014 | Completed final sign-off Nov 2015 | 3660 Folsom St | 1st flr and attic flr improvement. 1st flr to add a new office, a new bedroom and a full bathroom. attic floor to add new master bedroom a new bathroom, dressing room and storage room. 2nd flr. remodel entire floor per plan. add 2 new dormers and a new deck on new 3rd floor. replace 1 window at froDetails
1st flr and attic flr improvement. 1st flr to add a new office, a new bedroom and a full bathroom. attic floor to add new master bedroom a new bathroom, dressing room and storage room. 2nd flr. remodel entire floor per plan. add 2 new dormers and a new deck on new 3rd floor. replace 1 window at fro | $80,000 |
| Oct 15, 2014 | Completed final sign-off Nov 2014 | 40 Rosewood Dr | remodel 2 bathrooms, add 1 bathroom, 1 powder room, kitchen remodel, playroom, family roomDetails
remodel 2 bathrooms, add 1 bathroom, 1 powder room, kitchen remodel, playroom, family room | $45,000 |
| Jul 7, 2014 | Completed final sign-off Aug 2014 | 367 17th Av | revision to 201201132203. change roof to slate at front elevation. change window moulding, reconfigure 3rd fl bath and master bath, relocate closet at 2nd flDetails
revision to 201201132203. change roof to slate at front elevation. change window moulding, reconfigure 3rd fl bath and master bath, relocate closet at 2nd fl | |
| May 27, 2014 | Completed final sign-off Oct 2014 | 1459 Clayton St | remodel bathroom, replace tub, toilet & sink. replace fan & outlets. no structural work.Details
remodel bathroom, replace tub, toilet & sink. replace fan & outlets. no structural work. | $6,000 |
| Feb 19, 2014 | Completed final sign-off Dec 2015 | 1306 Florida St | 1st fl. extend garage 10' at rear yard, replace garage slab. 2nd fl reconfigure walls, remodel kitchen and bath.Details
1st fl. extend garage 10' at rear yard, replace garage slab. 2nd fl reconfigure walls, remodel kitchen and bath. | $60,000 |