Els Construction Inc.
- Based in
- Redwood City
- On San Francisco permits
- Jan 2017 to Jan 2019
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2019 | Completed final sign-off Dec 2019 | 159 21st Av | exterior work e windows on level 2 front facade to be replaced in kind. inter work 2nd fl interior courtyard to be infilled, kitchen dining rm, hallway remodeled (n) skylights above existing roofDetails
exterior work e windows on level 2 front facade to be replaced in kind. inter work 2nd fl interior courtyard to be infilled, kitchen dining rm, hallway remodeled (n) skylights above existing roof | $65,000 |
| Sep 29, 2017 | Completed final sign-off Nov 2017 | 999 16th St | unit 10: new shower in (e) location, new vanity in (e) location; bathroom in upper level unit.Details
unit 10: new shower in (e) location, new vanity in (e) location; bathroom in upper level unit. | $7,000 |
| Jun 15, 2017 | Completed final sign-off May 2018 | 48 Pierce St | replace visible rear windows (18 total - 9 smaller transoms over 9 longer fixed/casement windows) in-kind. same material (wood), same design, same operation(s), same size.Details
replace visible rear windows (18 total - 9 smaller transoms over 9 longer fixed/casement windows) in-kind. same material (wood), same design, same operation(s), same size. | $20,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2018 | 159 21st Av | replace sheetrock, tile, cabinets in existing area due to flood. new vanity, shower and floors in bathroom. new carpet in bedroom, new fixtures. all work on ground fl.Details
replace sheetrock, tile, cabinets in existing area due to flood. new vanity, shower and floors in bathroom. new carpet in bedroom, new fixtures. all work on ground fl. | $19,000 |
| Jan 13, 2017 | Completed final sign-off May 2017 | 2904 Bush St | remodel kitchen, new cabinets, tops and appliances. dry rot repair at entry. repair risers, treads and porch deck in kind, same materials. repair bay wooden window in kind.Details
remodel kitchen, new cabinets, tops and appliances. dry rot repair at entry. repair risers, treads and porch deck in kind, same materials. repair bay wooden window in kind. | $49,000 |