Back to bathroom remodel contractors
Elliott Build Remodel Llc
- Based in
- Berkeley
- On San Francisco permits
- Jan 2010 to Sep 2024
- Last 24 months
- 0 permits filed
137 permits since 2000: 129 completed, 1 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
57 bathroom remodel permits: 54 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2024 | Completed final sign-off Aug 2024 | 157 College Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $18,500 |
| Feb 13, 2024 | Completed final sign-off Jun 2024 | 2559 Diamond St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $45,000 |
| Apr 23, 2021 | Completed final sign-off Jan 2022 | 196 Laidley St | replace in kind kitchen and bathroom remodel w/fixtures remaining in same locations. addition of 1 sink in kitchen and washer and dryer hookupd in bathroom. replace bathroom casement windows in kind w tempered glass no change in size. relocate transome window in kitchen 2' reuse existing.Details
replace in kind kitchen and bathroom remodel w/fixtures remaining in same locations. addition of 1 sink in kitchen and washer and dryer hookupd in bathroom. replace bathroom casement windows in kind w tempered glass no change in size. relocate transome window in kitchen 2' reuse existing. | $96,000 |
| Apr 16, 2021 | Expired or cancelled cancelled Jun 2025 | 1001 Ulloa St | (n) deck @ rear yard. replacement includs:windows throughout w/ wood windows; sun rm walls & roof w/ (n) stucco walls/ skylight sys & windows;(e) garage door. remove 2 chimneys. remodle:(n) garage w/ (n) storage, wine rm & (n) stairs; kitchen,fmy rom & bath @ 1st fl;mstr bedrm, rm,bath,Details
(n) deck @ rear yard. replacement includs:windows throughout w/ wood windows; sun rm walls & roof w/ (n) stucco walls/ skylight sys & windows;(e) garage door. remove 2 chimneys. remodle:(n) garage w/ (n) storage, wine rm & (n) stairs; kitchen,fmy rom & bath @ 1st fl;mstr bedrm, rm,bath, | $100,000 |
| Mar 11, 2021 | Completed final sign-off Nov 2021 | 609 16th Av | replace in kind bathroom remodel and create 1 new bathoom in master suite, walk in shower, 2 sinks and toilet. facade window work shown on plans of pa 202102174780. replace in kind existing bath window.Details
replace in kind bathroom remodel and create 1 new bathoom in master suite, walk in shower, 2 sinks and toilet. facade window work shown on plans of pa 202102174780. replace in kind existing bath window. | $80,000 |
| Mar 4, 2021 | Completed final sign-off Apr 2022 | 266 Winfield St | addition of a new bath and roof dormer at the 2/f. exterior changes include 2 new windows and 2 new skylights. relocate (e) washer and dryer to closet. replace (e) toilet and pedestal sink at 1/f bath. replace (e) furnace at foundation level and provide ducting to living area at 2/f.Details
addition of a new bath and roof dormer at the 2/f. exterior changes include 2 new windows and 2 new skylights. relocate (e) washer and dryer to closet. replace (e) toilet and pedestal sink at 1/f bath. replace (e) furnace at foundation level and provide ducting to living area at 2/f. | $7,500 |
| Dec 17, 2020 | Completed final sign-off Mar 2021 | 3846 23rd St | replace in kind bathroom w/all plumbing and electrical remaining in same general locations, 2 new circuts from (e) subpanel for dedicated gfci & lights/ fanDetails
replace in kind bathroom w/all plumbing and electrical remaining in same general locations, 2 new circuts from (e) subpanel for dedicated gfci & lights/ fan | $15,000 |
| Dec 7, 2020 | Completed final sign-off May 2021 | 44 Amethyst Wy | replace in kind kitchen & bathroom, all appliances & fixtures to remain in same locations, new electrical from sub panel run new gas line to range & dryer , new cabinets & all new finishesDetails
replace in kind kitchen & bathroom, all appliances & fixtures to remain in same locations, new electrical from sub panel run new gas line to range & dryer , new cabinets & all new finishes | $50,000 |
| Aug 6, 2020 | Completed final sign-off Oct 2020 | 1211 Noe St | replace in kind bathroom (38.75 sq ft) remodel, no walls will be moved, square footage will not change, bathroom located in front of unit on 3rd floorDetails
replace in kind bathroom (38.75 sq ft) remodel, no walls will be moved, square footage will not change, bathroom located in front of unit on 3rd floor | $15,000 |
| May 20, 2020 | Completed final sign-off Nov 2020 | 280 Dalewood Wy | kitchen renovation , replace cabinets, new kitchen finishes, applicances, light, elec.enlarge openings into kithcen, provide new posts beam at enlarged opening, renovate e 1st fl pwdr room and 2nd fl bath, relace e fireplace in living rmDetails
kitchen renovation , replace cabinets, new kitchen finishes, applicances, light, elec.enlarge openings into kithcen, provide new posts beam at enlarged opening, renovate e 1st fl pwdr room and 2nd fl bath, relace e fireplace in living rm | $75,000 |
| Mar 9, 2020 | Completed final sign-off Nov 2021 | 324 Laidley St | remodel kitchen and master bathroom at 2nd fl. remove fireplace and chimney, replace interior stairs from 1st fl to 2nd fl. and to garage, new aluminm sliding glass at back patio on 1st fl. new moment frame at garageDetails
remodel kitchen and master bathroom at 2nd fl. remove fireplace and chimney, replace interior stairs from 1st fl to 2nd fl. and to garage, new aluminm sliding glass at back patio on 1st fl. new moment frame at garage | $225,000 |
| Feb 6, 2020 | Completed final sign-off May 2021 | 46 Hancock St | interior renovation of (e) kitchen and bath, 2 additional skylights, removal of 1 wall adjacent to kitchen, replace rear window and door in kindDetails
interior renovation of (e) kitchen and bath, 2 additional skylights, removal of 1 wall adjacent to kitchen, replace rear window and door in kind | $50,000 |
| Feb 5, 2020 | Completed final sign-off May 2020 | 279 Richland Av | replace in kind bathroom. new flooring in office. no change to existing floor plans. no exterior changes. new subpanel. replace / upgrade electrical as needed. new plumbing fixtures.Details
replace in kind bathroom. new flooring in office. no change to existing floor plans. no exterior changes. new subpanel. replace / upgrade electrical as needed. new plumbing fixtures. | $20,000 |
| Jan 8, 2020 | Completed final sign-off Jul 2020 | 369 Arlington St | bathroom remodel 5' x 8': (n) plumbing fixtures, tile, shower pan, electrical, glass enclosure. repair leaking roof under (e) deck. replace in-kind 2 windows, 1 door, not visible from streetDetails
bathroom remodel 5' x 8': (n) plumbing fixtures, tile, shower pan, electrical, glass enclosure. repair leaking roof under (e) deck. replace in-kind 2 windows, 1 door, not visible from street | $10,000 |
| Oct 23, 2019 | Expired or cancelled expired Nov 2022 | 2425 15th St | revision to app#201905160809. removal demizing wall btwn kitchen and living , add structural beams as needed. add'l excavation at grade level within extg garage for new grade beams. revised layout at nw bath at grade level.Details
revision to app#201905160809. removal demizing wall btwn kitchen and living , add structural beams as needed. add'l excavation at grade level within extg garage for new grade beams. revised layout at nw bath at grade level. | $90,000 |
| May 16, 2019 | Expired or cancelled expired Nov 2022 | 2425 15th St | grade level- finish rear half of (e) garage as entertainment room including structural upgade, rear elevation fenestration, (n) bathroom, and radiant flooring, main level- remodel (e) kitchen with (n) finishes, fixtures, applicances, remodel (e) bathroom, remove side yard porch, add (n) full bath,Details
grade level- finish rear half of (e) garage as entertainment room including structural upgade, rear elevation fenestration, (n) bathroom, and radiant flooring, main level- remodel (e) kitchen with (n) finishes, fixtures, applicances, remodel (e) bathroom, remove side yard porch, add (n) full bath, | $90,000 |
| Aug 29, 2018 | Completed final sign-off Mar 2019 | 40 Dellbrook Av | replace in kind kitchen remodel, replace in kind 2 bathroom remodel.Details
replace in kind kitchen remodel, replace in kind 2 bathroom remodel. | $51,327 |
| Jun 5, 2018 | Completed final sign-off Aug 2018 | 233 Franklin St | #305 - replace inkind bath remodel change tub to shower panDetails
#305 - replace inkind bath remodel change tub to shower pan | $15,000 |
| Apr 12, 2018 | Completed final sign-off Aug 2018 | 249 Shipley St | unit 8: remodel in-kind master bath. replace kitchen counter. replace powder room counter. n/a for maher.Details
unit 8: remodel in-kind master bath. replace kitchen counter. replace powder room counter. n/a for maher. | $28,000 |
| Apr 5, 2018 | Completed final sign-off Oct 2018 | 167 Monterey Bl | bathroom remodel eliminate seperate shower & new finishes. laundry room area remodel adjacent to garage on grnd flr. reconfigure location of w/d add storage cabinetsDetails
bathroom remodel eliminate seperate shower & new finishes. laundry room area remodel adjacent to garage on grnd flr. reconfigure location of w/d add storage cabinets | $25,000 |
| Nov 8, 2017 | Completed final sign-off Jan 2019 | 500 Myra Wy | kitchen remodel with lightwell infill to blindwall. remodel 3rd fl bathroom.Details
kitchen remodel with lightwell infill to blindwall. remodel 3rd fl bathroom. | $40,000 |
| Oct 5, 2017 | Completed final sign-off Jun 2018 | 335 Coleridge St | kitchen remodel, (2) bathroom remodel, refinish floor paint, 1 replace in kind windoww, not visible from street.Details
kitchen remodel, (2) bathroom remodel, refinish floor paint, 1 replace in kind windoww, not visible from street. | $45,000 |
| Sep 18, 2017 | Completed final sign-off Jan 2018 | 1962 Ellis St | construct new full bathroom with laundry area in previously finished room in 2/f. hazardous materials remediation required at (e) hvac system, new energy efficient recessed lighting in ceiling of (e) hallway, electrical, plumbing and ,mechanical modification as shownDetails
construct new full bathroom with laundry area in previously finished room in 2/f. hazardous materials remediation required at (e) hvac system, new energy efficient recessed lighting in ceiling of (e) hallway, electrical, plumbing and ,mechanical modification as shown | $25,000 |
| Aug 22, 2017 | Completed final sign-off Oct 2017 | 239 Bartlett St | bathroom remodel, replace in-kind.Details
bathroom remodel, replace in-kind. | $10,000 |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 2257 15th St | upper floor -bathroom remodel.Details
upper floor -bathroom remodel. | $12,000 |
| Apr 12, 2017 | Completed final sign-off Dec 2017 | 520 Day St | 2nd flr: bath & kitchen remodel w/1 new window & 1 sliding glass door. 3rd flr: mster suite renovation, ele upgrade, new radiant heat throughout. deck repair. windows to be replaced w/double pan wood clad in kindDetails
2nd flr: bath & kitchen remodel w/1 new window & 1 sliding glass door. 3rd flr: mster suite renovation, ele upgrade, new radiant heat throughout. deck repair. windows to be replaced w/double pan wood clad in kind | $80,000 |
| Apr 7, 2017 | Completed final sign-off Jan 2018 | 38 Bryant St | remodel in-kind 2 bathrooms.Details
remodel in-kind 2 bathrooms. | $20,000 |
| Mar 23, 2017 | Completed final sign-off Aug 2017 | 668 33rd Av | work only on 668 33rd ave (lower unit on 2nd floor) interior work only. remodel (e) bath; replace and/or re-arrange fixtures & finishes; expand (e) toilet room, turn into full bath; (n) shower, (n) vanity sinkDetails
work only on 668 33rd ave (lower unit on 2nd floor) interior work only. remodel (e) bath; replace and/or re-arrange fixtures & finishes; expand (e) toilet room, turn into full bath; (n) shower, (n) vanity sink | $20,000 |
| Mar 2, 2017 | Completed final sign-off Aug 2017 | 467 Oak St | remodel (e) kitchen, remodel (e) bathroom according to plansDetails
remodel (e) kitchen, remodel (e) bathroom according to plans | $25,000 |
| Feb 1, 2017 | Completed final sign-off Feb 2018 | 1515 26th Av | add bathroom at 1/f. no structural work, new furnace/water heater to serve the whole house.Details
add bathroom at 1/f. no structural work, new furnace/water heater to serve the whole house. | $15,000 |
| Nov 30, 2016 | Completed final sign-off Feb 2017 | 219 Cotter St | bathroom remodel in-kind.Details
bathroom remodel in-kind. | $14,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2017 | 1424 Diamond St | replace in-kind bathroom remodel. replace in-kind (e) skylight.Details
replace in-kind bathroom remodel. replace in-kind (e) skylight. | $15,000 |
| Oct 24, 2016 | Completed final sign-off Jan 2018 | 542 Central Av | interior remodel unit including kitchen, bathroom, and new finishes throughout. new windows not visible from street.Details
interior remodel unit including kitchen, bathroom, and new finishes throughout. new windows not visible from street. | $75,000 |
| Sep 19, 2016 | Completed final sign-off Nov 2016 | 175 Coleridge St | remodel bathroom on second floor. see plansDetails
remodel bathroom on second floor. see plans | $20,000 |
| Sep 2, 2016 | Completed final sign-off Feb 2017 | 333 Laidley St | revision to ref pa 201606210485 omit master bath expansion. limit plumbing work to replace in kind only. remodel & replace plumbing fixtures onlyDetails
revision to ref pa 201606210485 omit master bath expansion. limit plumbing work to replace in kind only. remodel & replace plumbing fixtures only | |
| Jun 21, 2016 | Completed final sign-off Feb 2017 | 333 Laidley St | remodel kitchen & bath, remove walls @living and kitchen, add beam replace 2 windows + one door @ rear facade. remodel bath 2, replace in-kind all fixtures & finishes.Details
remodel kitchen & bath, remove walls @living and kitchen, add beam replace 2 windows + one door @ rear facade. remodel bath 2, replace in-kind all fixtures & finishes. | $50,000 |
| Mar 29, 2016 | Completed final sign-off Mar 2017 | 152 Banks St | replace fixtures in (e) baths, remove fireplace, remove 2 interior walls at kitchen, remodel kitchen, install (n) glass railing, replace entry door/sidelite, install (n) sliding door & skylights @ 2/f, (n) floor finishes @ entry, baths & kitchen,Details
replace fixtures in (e) baths, remove fireplace, remove 2 interior walls at kitchen, remodel kitchen, install (n) glass railing, replace entry door/sidelite, install (n) sliding door & skylights @ 2/f, (n) floor finishes @ entry, baths & kitchen, | $85,000 |
| Mar 16, 2016 | Completed final sign-off Jul 2016 | 1241 Francisco St | bathroom remodel - replace in-kind.Details
bathroom remodel - replace in-kind. | $10,000 |
| Feb 11, 2016 | Completed final sign-off Jun 2017 | 354 Bradford St | remodel single family residence includes updating e basement to include new bedroom and bath new stair to main level e garage to remainDetails
remodel single family residence includes updating e basement to include new bedroom and bath new stair to main level e garage to remain | $120,000 |
| Feb 9, 2016 | Completed final sign-off May 2016 | 4 Sharp Pl | replace in-kind bath remodel. replace in-kind 2 windows in light well u-factor 0.32.Details
replace in-kind bath remodel. replace in-kind 2 windows in light well u-factor 0.32. | $15,000 |
| Jan 27, 2016 | Completed final sign-off Apr 2016 | 143 Valdez Av | replace in-kind bathroom remodel, replace (e) skylight with velux 0.40 u-factor.Details
replace in-kind bathroom remodel, replace (e) skylight with velux 0.40 u-factor. | $15,000 |
| Oct 14, 2015 | Completed final sign-off Dec 2015 | 8 Seacliff Av | replace in-kind bathroom remodel.Details
replace in-kind bathroom remodel. | $12,000 |
| Aug 12, 2015 | Completed final sign-off Dec 2015 | 2551 15th Av | bathroom remodel replace in-kind. no walls to be altered.Details
bathroom remodel replace in-kind. no walls to be altered. | $15,000 |
| Jun 29, 2015 | Completed final sign-off Oct 2015 | 19 Foerster St | replace in kind kitchen remodel, replace in kind bathroom remodel.Details
replace in kind kitchen remodel, replace in kind bathroom remodel. | $28,000 |
| May 21, 2015 | Completed final sign-off Aug 2015 | 3037 22nd St | replace in-kind bathroom remodel. no walls to be removed or relocated.Details
replace in-kind bathroom remodel. no walls to be removed or relocated. | $12,000 |
| Mar 27, 2015 | Completed final sign-off Feb 2016 | 3832 21st St | remove (e) unpermitted enclosure over (e) main level deck, demo & replace (e) kitchen - cabinets, apps, fixtures & finishes. add 2nd bathrm to (e) upper level master bedrm, remodel (e upper level bathroom , demo (e) bath, add shower, relocate sink & toilet. add laundry closet to upper level/hall.Details
remove (e) unpermitted enclosure over (e) main level deck, demo & replace (e) kitchen - cabinets, apps, fixtures & finishes. add 2nd bathrm to (e) upper level master bedrm, remodel (e upper level bathroom , demo (e) bath, add shower, relocate sink & toilet. add laundry closet to upper level/hall. | $15,000 |
| Mar 23, 2015 | Completed final sign-off Jun 2015 | 376 Laidley St | kitchen & bath remodelDetails
kitchen & bath remodel | $50,000 |
| Feb 19, 2015 | Completed final sign-off Apr 2015 | 1 Vulcan Sw | remodel bathroom, replace in kind fixtures, tile, shower panDetails
remodel bathroom, replace in kind fixtures, tile, shower pan | $20,000 |
| Sep 18, 2014 | Completed final sign-off Nov 2014 | 422 Missouri St | remodel upstairs bathroom, shower same location but 1'larger, toilet same location, bath tub and lavatory new locations.Details
remodel upstairs bathroom, shower same location but 1'larger, toilet same location, bath tub and lavatory new locations. | $15,000 |
| Aug 12, 2014 | Completed final sign-off Sep 2018 | 221 Elsie St | foundation replacement;remodel first flr storage, bedroom, office space, half bath. remodel 2nd flr half bath;new door -windows run room. add laundry in closet at 3rd flr. widen garage 10'Details
foundation replacement;remodel first flr storage, bedroom, office space, half bath. remodel 2nd flr half bath;new door -windows run room. add laundry in closet at 3rd flr. widen garage 10' | $100,000 |
| Jun 6, 2014 | Completed final sign-off Sep 2014 | 366 Arlington St | interior remodel at 1st flr den and bathroom and 2nd flr kitchen, dining and living roomDetails
interior remodel at 1st flr den and bathroom and 2nd flr kitchen, dining and living room | $40,000 |
| May 5, 2014 | Completed final sign-off Jul 2014 | 143 Valdez Av | remodel existing bathroom, 75 sq.ft.Details
remodel existing bathroom, 75 sq.ft. | $17,000 |
| Mar 11, 2014 | Completed final sign-off Apr 2014 | 3867 17th St | replace in kind kitchen cabinets, counter & appliances, bring kitchen electrical to code, replace toilet & bath vanity, & bathroom floor, replace carpet, paint, all high efficiancy lighting in bath & kitchenDetails
replace in kind kitchen cabinets, counter & appliances, bring kitchen electrical to code, replace toilet & bath vanity, & bathroom floor, replace carpet, paint, all high efficiancy lighting in bath & kitchen | $18,000 |
| Oct 3, 2013 | Completed final sign-off Mar 2014 | 38 Newman St | interior remodel of existing lower floor, approx 480 sf. renovation to include new bedroom, remodel bathroom, new finishes with consistent ceiling height throughoutDetails
interior remodel of existing lower floor, approx 480 sf. renovation to include new bedroom, remodel bathroom, new finishes with consistent ceiling height throughout | $55,000 |
| Jun 24, 2013 | Completed final sign-off Aug 2013 | 376 Laidley St | bathroom remodel - replace in kind bath tub, vanity, bath fan, tile, reuse existing toilet. no alteration of partition wallDetails
bathroom remodel - replace in kind bath tub, vanity, bath fan, tile, reuse existing toilet. no alteration of partition wall | $10,000 |
| May 10, 2012 | Completed final sign-off Jun 2012 | 4125 24th St | remodel kitchen, new cabinets, counters, new sink, new appliances, replace old electrical sub panel, vent hood outside, replace bathroom vanity, high efficacy lighting 50% in kitchen. comply with smoke/co alarm requirement per cbc-2010Details
remodel kitchen, new cabinets, counters, new sink, new appliances, replace old electrical sub panel, vent hood outside, replace bathroom vanity, high efficacy lighting 50% in kitchen. comply with smoke/co alarm requirement per cbc-2010 | $16,000 |
| Aug 23, 2011 | Completed final sign-off Oct 2011 | 1207 Noe St | remodel of (e) kitchen, reuse (e) lowers, replace uppers, pull & repl fixtures, repl wood floors throughout, remodel of (e) bathroom, pull & repl fixtures & finishes, no drawing permit, kitchen & bath 210 sf, no work visible from streetDetails
remodel of (e) kitchen, reuse (e) lowers, replace uppers, pull & repl fixtures, repl wood floors throughout, remodel of (e) bathroom, pull & repl fixtures & finishes, no drawing permit, kitchen & bath 210 sf, no work visible from street | $18,277 |