Back to bathroom remodel contractors
Elite Engineering Contractors
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to Feb 2026
- Last 24 months
- 4 permits filed
15 permits since 2000: 7 completed, 6 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 1 in progress, 1 expired or cancelled. Typically 2 days from filing to permit and 326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2023 | In progress issued Oct 2024 | 1462 11th Av | 941 sf vert addition of (n) 3rd flr to incl: 3 bdrms,2 baths. (n)doors, wndws & skylites. int partition chnges @ 1st & 2nd flrs. (n)2nd fl blcny & stair to rear yd. 9sf court infill 2nd fl. relocate 1st fl mech equip. full seismic upgrd of bldg. rmdl entry hall at level 1. relocate garage door.Details
941 sf vert addition of (n) 3rd flr to incl: 3 bdrms,2 baths. (n)doors, wndws & skylites. int partition chnges @ 1st & 2nd flrs. (n)2nd fl blcny & stair to rear yd. 9sf court infill 2nd fl. relocate 1st fl mech equip. full seismic upgrd of bldg. rmdl entry hall at level 1. relocate garage door. | $450,000 |
| Mar 26, 2018 | Expired or cancelled suspend Jul 2019 | 184 Lunado Wy | construct family room, (2) bedroom, media room, (2) full bath room & (1) powder room at g/f. remodel (e) kitchen, (2) bathroom & add (1) powder room. relocate interior staircase & construct (4) skylight at 2/f. upgrade partial (e) foundation.Details
construct family room, (2) bedroom, media room, (2) full bath room & (1) powder room at g/f. remodel (e) kitchen, (2) bathroom & add (1) powder room. relocate interior staircase & construct (4) skylight at 2/f. upgrade partial (e) foundation. | $180,000 |
| Dec 26, 2017 | Completed final sign-off Sep 2018 | 355 Highland Av | convert rear portion of garage to family room and half bath. maher naDetails
convert rear portion of garage to family room and half bath. maher na | $45,000 |
| Sep 23, 2015 | Completed final sign-off Oct 2016 | 168 Lunado Ct | to comply with comp. 201569141 - legalize 2 bedrooms, family room; remodel 1 (e) bedroom & bathroom & construct new bath room at ground floor; relocate (e) kitchen, convert kitchen into bedroom & bathroom. re-wire electrical and lighting at 2/f; remodel (e) bedroom and bath room @ 3rd flDetails
to comply with comp. 201569141 - legalize 2 bedrooms, family room; remodel 1 (e) bedroom & bathroom & construct new bath room at ground floor; relocate (e) kitchen, convert kitchen into bedroom & bathroom. re-wire electrical and lighting at 2/f; remodel (e) bedroom and bath room @ 3rd fl | $85,000 |