Elite Construction Company
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Oct 2020
- Last 24 months
- 0 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 132 days from filing to permit and 676 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2020 | Completed final sign-off Sep 2022 | 1874 41st Av | proposed infill addition at the 1st level rear portion of the existing single family home to accomodate one addition bathroom & bedroom. addition of deck at 2nd floor.Details
proposed infill addition at the 1st level rear portion of the existing single family home to accomodate one addition bathroom & bedroom. addition of deck at 2nd floor. | $150,000 |
| Mar 2, 2017 | Completed final sign-off Mar 2018 | 2427 32nd Av | revision to pa #201508275470. reconfigure internal stairs. relocate furnace, w/d, flip toilet & vanity in bathrm. delete 1/2 bath at upper floor. remove window at kitchen. foundation & framing revisions.Details
revision to pa #201508275470. reconfigure internal stairs. relocate furnace, w/d, flip toilet & vanity in bathrm. delete 1/2 bath at upper floor. remove window at kitchen. foundation & framing revisions. | |
| Sep 11, 2015 | Completed final sign-off Aug 2018 | 253 Judson Av | horizontal addition @ rear of (e) single family home. proposed interior remodel @ 1st floor adding 1 new bedroom & family room. 2nd floor adding 1 new bedroom & 1 bathroom.Details
horizontal addition @ rear of (e) single family home. proposed interior remodel @ 1st floor adding 1 new bedroom & family room. 2nd floor adding 1 new bedroom & 1 bathroom. | $285,000 |
| Aug 27, 2015 | Completed final sign-off Mar 2018 | 2427 32nd Av | conversion of rear portion of garage level to conditioned space including 2 bedrooms, relocate bathroom. interior remodel of 2nd level & add 1 full bath & 1 half bath. all work to be performed within (e) boundary of the bldg.Details
conversion of rear portion of garage level to conditioned space including 2 bedrooms, relocate bathroom. interior remodel of 2nd level & add 1 full bath & 1 half bath. all work to be performed within (e) boundary of the bldg. | $175,000 |