Eleven Western Builders
- Based in
- Escondidio
- On San Francisco permits
- Dec 2009 to Jun 2026
- Last 24 months
- 1 permit filed
8 permits since 2000: 5 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2026 | In progress issued Jun 2026 | 850 La Playa | to obtain final inspection for work approved under pa# 202112073829. all work is complete.Details
to obtain final inspection for work approved under pa# 202112073829. all work is complete. | |
| Dec 7, 2021 | Completed final sign-off Jun 2022 | 625 Monterey Bl | interior: modifications to interior building elements to comply with ada requirements, including restroom facilities, signage, clear floor space requirements. exterior: relocation of accessible parking space from the roof level parking lot to the gr level parking lot, modifications to a portion ofDetails
interior: modifications to interior building elements to comply with ada requirements, including restroom facilities, signage, clear floor space requirements. exterior: relocation of accessible parking space from the roof level parking lot to the gr level parking lot, modifications to a portion of | $75,000 |
| Dec 7, 2021 | Never finaled issued Dec 2021, no final | 850 La Playa | interior modifications to interior building elements to comply with ada requirements including restroom facilities, signage, clear floor space requirements. exterior: replacment of truncated domes at existing curb ramps, replacment of tow away sign, modification to a portion of the parking lot toDetails
interior modifications to interior building elements to comply with ada requirements including restroom facilities, signage, clear floor space requirements. exterior: replacment of truncated domes at existing curb ramps, replacment of tow away sign, modification to a portion of the parking lot to | $75,000 |
| Jun 17, 2021 | Completed final sign-off Dec 2021 | 2350 Noriega St | mod to interior bldg elements to comply w/ada requirements, restroom facilities, signage & clear floor space reqs, modific to portion of exterior groun level parking lot to comply w/ada requirements, walkway/pavement removal & reconstruction, install req ada signs, remove excess ada pkg @ rooftop,Details
mod to interior bldg elements to comply w/ada requirements, restroom facilities, signage & clear floor space reqs, modific to portion of exterior groun level parking lot to comply w/ada requirements, walkway/pavement removal & reconstruction, install req ada signs, remove excess ada pkg @ rooftop, | $30,000 |
| Jul 17, 2012 | Completed final sign-off Aug 2012 | 1765 California St | to obtain final inspection for work approved under pa# 201004069737. all work is complete.Details
to obtain final inspection for work approved under pa# 201004069737. all work is complete. | |
| Apr 4, 2011 | Never finaled issued Apr 2011, no final | 450 Rhode Island St | whole foods. relocate / move over one existing van accessible parking space over one space to accomodate a new cart corral for shopping carts. the new space will be restripped, no changeswill be made to the entrance ramp.Details
whole foods. relocate / move over one existing van accessible parking space over one space to accomodate a new cart corral for shopping carts. the new space will be restripped, no changeswill be made to the entrance ramp. | $4,000 |
| Apr 6, 2010 | Completed final sign-off Aug 2012 | 1765 California St | whole foods market. removal of (e) cases and millwork, the addition of 2 refrigerated cases and replacement of 2 other cases with like kind. minor patching and repairing of (e) epoxy flooring. no lighting work.Details
whole foods market. removal of (e) cases and millwork, the addition of 2 refrigerated cases and replacement of 2 other cases with like kind. minor patching and repairing of (e) epoxy flooring. no lighting work. | $28,000 |
| Dec 16, 2009 | Completed final sign-off Mar 2010 | 1765 California St | whole food remodel to include replacement of equipment in bakery and deli service areas. all existing exits,aisle clearances maintained. relocate hot chicken case. remove heat lamp with patch,paint, and repair of soffit. patch/repair epoxy floorDetails
whole food remodel to include replacement of equipment in bakery and deli service areas. all existing exits,aisle clearances maintained. relocate hot chicken case. remove heat lamp with patch,paint, and repair of soffit. patch/repair epoxy floor | $125,000 |