Back to bathroom remodel contractors
Eldredge Woodworks
- Based in
- Fair Oaks
- On San Francisco permits
- Dec 2016 to Apr 2022
- Last 24 months
- 0 permits filed
37 permits since 2000: 20 completed, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 12 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2018 | Completed final sign-off Aug 2019 | 233 Bartlett St | bathroom, laundry room. update surfaces, cabinets, counters, flooring, drywall work, electrical, plumbing, new tub/shower tile surround, new toilet, paint whole house. no walls moved, removed added or infilled, all existing layouts to remain unchanged.Details
bathroom, laundry room. update surfaces, cabinets, counters, flooring, drywall work, electrical, plumbing, new tub/shower tile surround, new toilet, paint whole house. no walls moved, removed added or infilled, all existing layouts to remain unchanged. | $55,000 |
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 226 Edinburgh St | in kind kitchen remodel, cabinets, counter, surfaces floors new sink faucet, disposal, demo lath and plaster. kitchen and bath drywall and install ne, provide and rpelace new elec panel, rewire entire house. install under cabinet lights, new and update outlet 110v, add 20 a new hood, recessed lightsDetails
in kind kitchen remodel, cabinets, counter, surfaces floors new sink faucet, disposal, demo lath and plaster. kitchen and bath drywall and install ne, provide and rpelace new elec panel, rewire entire house. install under cabinet lights, new and update outlet 110v, add 20 a new hood, recessed lights | $35,000 |
| Jun 19, 2018 | Never finaled issued Jun 2018, no final | 2011 03rd St | unit 4: kitchen remodel:update surfaces, caibnets, lighting, relocate sink approx 1ft. upgrade outlets & relocate. remove pony wall & add a pony wall. bathroom: r/r light fixtures.Details
unit 4: kitchen remodel:update surfaces, caibnets, lighting, relocate sink approx 1ft. upgrade outlets & relocate. remove pony wall & add a pony wall. bathroom: r/r light fixtures. | $13,405 |
| Jan 18, 2018 | Completed final sign-off Mar 2018 | 300 03rd St | work in unit #1511: in-kind kitchen remodel - no walls or windows - electrical cabinetry - floors, countertops - paint - light fixture- bath remodel in-kind - tile - vanityDetails
work in unit #1511: in-kind kitchen remodel - no walls or windows - electrical cabinetry - floors, countertops - paint - light fixture- bath remodel in-kind - tile - vanity | $40,000 |
| Mar 17, 2017 | Expired or cancelled expired Sep 2018 | 2707 20th St | remodel kitchen cabinets/plumb/elec/flooring.create wall opening 10ft remodel bath cabinets/plumb/elec/flooring. create 8ft wall opening, detailed scope of work listed on cover sheetDetails
remodel kitchen cabinets/plumb/elec/flooring.create wall opening 10ft remodel bath cabinets/plumb/elec/flooring. create 8ft wall opening, detailed scope of work listed on cover sheet | $55,000 |
| Feb 2, 2017 | Completed final sign-off Oct 2017 | 924 Dwight St | one kitchen, one bathroom remodeling.Details
one kitchen, one bathroom remodeling. | $5,000 |