Back to bathroom remodel contractors
Eldar Design And Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Jun 2023
- Last 24 months
- 0 permits filed
28 permits since 2000: 17 completed, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2021 | Completed final sign-off Jun 2022 | 2515 25th Av | revision to existing bathroom remodel permit pa#202106293394. adding kitchen remodel.Details
revision to existing bathroom remodel permit pa#202106293394. adding kitchen remodel. | $15,500 |
| Jun 29, 2021 | Completed final sign-off Jun 2022 | 2515 25th Av | bath remodel. demo and rebuilt, no change to plumbing and electrical. new tile suround.Details
bath remodel. demo and rebuilt, no change to plumbing and electrical. new tile suround. | $10,000 |
| Feb 12, 2019 | Completed final sign-off Jun 2019 | 191 Downey St | e bath remodel relocate tub and sink. toilet to remain. new entry to toilet space. relocate some switches and plugsDetails
e bath remodel relocate tub and sink. toilet to remain. new entry to toilet space. relocate some switches and plugs | $25,000 |
| Mar 20, 2017 | Completed final sign-off Dec 2017 | 1667 Fulton St | remodel e bath and kitchen. remove some non bearing walls per drawingDetails
remodel e bath and kitchen. remove some non bearing walls per drawing | $60,000 |
| Feb 4, 2016 | Completed final sign-off Dec 2016 | 1667 Fulton St | remodeling (e) bath and kitchen. remodel (e) sheetrock from ceiling and install 2 layers of 5/8 sheetrock type x over accoustical isolatorsDetails
remodeling (e) bath and kitchen. remodel (e) sheetrock from ceiling and install 2 layers of 5/8 sheetrock type x over accoustical isolators | $20,000 |
| May 24, 2012 | Completed final sign-off Dec 2012 | 2136 Grove St | remodel (e) bathroom: relocate tub & sink, add a new toilet, replace (e) toilet with new t 1/2 bath, change all plumbing pipes to copper, change all electrical fixtures & location, no structural work involved.Details
remodel (e) bathroom: relocate tub & sink, add a new toilet, replace (e) toilet with new t 1/2 bath, change all plumbing pipes to copper, change all electrical fixtures & location, no structural work involved. | $15,000 |