Ehline Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Mar 2026
- Last 24 months
- 3 permits filed
25 permits since 2000: 19 completed, 2 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 10 completed, 1 in progress, 3 never finaled. Typically 22 days from filing to permit and 297 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2026 | In progress issued Jul 2026 | 87 Elsie St | remodel of (e) bathrooms on 1st and 2nd floors.Details
remodel of (e) bathrooms on 1st and 2nd floors. | $60,000 |
| Jul 1, 2025 | Completed final sign-off Dec 2025 | 29 Douglass St | renovate existing bathroom on 2nd floor (29) douglas. remove and replace existing window at the rear with a french door on 29 douglasDetails
renovate existing bathroom on 2nd floor (29) douglas. remove and replace existing window at the rear with a french door on 29 douglas | $80,000 |
| Dec 4, 2023 | Completed final sign-off Oct 2024 | 1238 44th Av | selective demolition and modifications to interior space, adding new partions to convert an (e) storage area into a new family room and bathroom.Details
selective demolition and modifications to interior space, adding new partions to convert an (e) storage area into a new family room and bathroom. | $125,000 |
| May 16, 2022 | Completed final sign-off Mar 2023 | 1946 42nd Av | remodel one bathroom: remove existing tub and connect to shower. add new tile and fixtures, update electrical to code. no structural work - no framing modifications.Details
remodel one bathroom: remove existing tub and connect to shower. add new tile and fixtures, update electrical to code. no structural work - no framing modifications. | $25,000 |
| Jun 11, 2021 | Completed final sign-off Mar 2023 | 1946 42nd Av | converting (e) storage space on the g/f into a home office. (e) non-conforming fixures are being updated to allow a separate bathroom in the downstairs area. no structural mods proposed.Details
converting (e) storage space on the g/f into a home office. (e) non-conforming fixures are being updated to allow a separate bathroom in the downstairs area. no structural mods proposed. | $50,000 |
| Apr 16, 2021 | Completed final sign-off Oct 2022 | 1955 42nd Av | ground floor interior improvements: modification to (e) interior space through selective demolition and addition of new partitions to convert (e) storage into a new bedroom and bathroom.Details
ground floor interior improvements: modification to (e) interior space through selective demolition and addition of new partitions to convert (e) storage into a new bedroom and bathroom. | $75,000 |
| Nov 12, 2020 | Completed final sign-off Mar 2022 | 1455 Alabama St | remodeling of (e) space to install bathroom: one toilet, one sink, one shower stall and washer/dryer hookup. installation of plubing and electrical. space is located in the ne corner of lower level.Details
remodeling of (e) space to install bathroom: one toilet, one sink, one shower stall and washer/dryer hookup. installation of plubing and electrical. space is located in the ne corner of lower level. | $55,000 |
| Dec 2, 2019 | Never finaled issued Dec 2019, no final | 1760 Alabama St | remodel existing bathroom in kind.Details
remodel existing bathroom in kind. | $25,000 |
| Nov 28, 2018 | Completed final sign-off Nov 2019 | 2905 23rd St | unit 2905 - relocate kitchen & bath add 1 new exterior door at rear install new furnance & w/h. unit 2907 - remodel (e) kitchen & bath, add new windows and doors at rear add skylight at officeDetails
unit 2905 - relocate kitchen & bath add 1 new exterior door at rear install new furnance & w/h. unit 2907 - remodel (e) kitchen & bath, add new windows and doors at rear add skylight at office | $135,000 |
| May 4, 2018 | Completed final sign-off Feb 2019 | 110 Liberty St | remodel 2 existing bathrooms to include new tile, new lights, new fixtures. no change to walls, doors or openings. maher naDetails
remodel 2 existing bathrooms to include new tile, new lights, new fixtures. no change to walls, doors or openings. maher na | $20,000 |
| Oct 16, 2017 | Never finaled issued Oct 2017, no final | 244 Missouri St | bathroom and kitchen remodel. replace in kind existing kitchen and bathroomDetails
bathroom and kitchen remodel. replace in kind existing kitchen and bathroom | $15,000 |
| Jul 29, 2014 | Completed final sign-off Sep 2014 | 219 Cotter St | replace in-kind basement 1/2 bath.Details
replace in-kind basement 1/2 bath. | $6,000 |
| Mar 28, 2014 | Never finaled issued Aug 2014, no final | 3873 17th St | interior remodel to (e) lower unit in 2 unit residence. remodel (e) kitchen & master bath, add (n) bathroom,. demolished (e) closet & build (n) bathroom.Details
interior remodel to (e) lower unit in 2 unit residence. remodel (e) kitchen & master bath, add (n) bathroom,. demolished (e) closet & build (n) bathroom. | $69,464 |
| Sep 19, 2013 | Completed final sign-off Feb 2014 | 126 Dolores St | convert a portion of the first floor to be a bedroom and a party room. add a bathroom at first floor. add exterior sink and counter at rear of building.Details
convert a portion of the first floor to be a bedroom and a party room. add a bathroom at first floor. add exterior sink and counter at rear of building. | $40,000 |