Back to bathroom remodel contractors
Egan Agape Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2012 to May 2025
- Last 24 months
- 1 permit filed
18 permits since 2000: 13 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2020 | Expired or cancelled cancelled Mar 2022 | 380 Pennsylvania Av | remodel bathroom w/ minor dryrot repair around window. add a new one and add new electrical cans & fan. keep the same floor plan. no structural work. replace (e) window, same size, same location, max u-factor 0.32, not visible from streetDetails
remodel bathroom w/ minor dryrot repair around window. add a new one and add new electrical cans & fan. keep the same floor plan. no structural work. replace (e) window, same size, same location, max u-factor 0.32, not visible from street | $30,000 |
| Dec 5, 2019 | Completed final sign-off Jul 2020 | 59 Vicksburg St | remove bath tub in master bath, replace in same location with new shower, install new toilet and sink, install (3) new led ceiling lights to replace (e) ceiling lights, replace (e) ceiling fan with new, install new vanity in powder room. no structural or floor plan change to be done.Details
remove bath tub in master bath, replace in same location with new shower, install new toilet and sink, install (3) new led ceiling lights to replace (e) ceiling lights, replace (e) ceiling fan with new, install new vanity in powder room. no structural or floor plan change to be done. | $28,000 |
| Sep 20, 2012 | Completed final sign-off Dec 2012 | 1260 Clay St | remodel bathroom, change from bathtub to shower, change lighting & move drain in the kitchen, replace old cabinet. kitchen is the same floor plan, upgrade and move lighting in kitchen and living room.Details
remodel bathroom, change from bathtub to shower, change lighting & move drain in the kitchen, replace old cabinet. kitchen is the same floor plan, upgrade and move lighting in kitchen and living room. | $35,700 |
| Sep 20, 2012 | Completed final sign-off Jan 2013 | 133 Divisadero St | remodel bathroom & bedroom, change from bathtub to shower, move drain, move and upgrade lighting, re-sheet rock bathroom and tile. move lighting for office desk in bedroom.Details
remodel bathroom & bedroom, change from bathtub to shower, move drain, move and upgrade lighting, re-sheet rock bathroom and tile. move lighting for office desk in bedroom. | $28,000 |