Back to bathroom remodel contractors
Edward P. Gama ( Lic Cancele By Cslb)
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Jul 2017
- Last 24 months
- 0 permits filed
23 permits since 2000: 18 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 never finaled. Typically 11 days from filing to permit and 332 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2017 | Never finaled issued Jun 2017, no final | 2749 Pierce St | remodel master bath and guest bathDetails
remodel master bath and guest bath | $10,000 |
| Dec 2, 2015 | Completed final sign-off Feb 2017 | 135 Buchanan St | convert 1st floor storage to living space (480 sq ft) include bedroom and full bath. install connecting stair to above. install 4 windows and 1 extg door (not visible). new patio slab rear retaining wall and relocate bottom run of patio stair. less than 10 ft ht. not visible to street.Details
convert 1st floor storage to living space (480 sq ft) include bedroom and full bath. install connecting stair to above. install 4 windows and 1 extg door (not visible). new patio slab rear retaining wall and relocate bottom run of patio stair. less than 10 ft ht. not visible to street. | $110,000 |
| Nov 21, 2013 | Never finaled issued Nov 2013, no final | 110 Pinehurst Wy | 1 bathroom remodel - to comply with cec150(k) 10, new tub, toilet, vanity and tile.Details
1 bathroom remodel - to comply with cec150(k) 10, new tub, toilet, vanity and tile. | $10,000 |
| Mar 5, 2012 | Completed final sign-off Jan 2013 | 136 Ord St | interior remodel: add 2 new baths and bedrooms on lower /basement floor. replace fenistrations. complete seismic upgrade.Details
interior remodel: add 2 new baths and bedrooms on lower /basement floor. replace fenistrations. complete seismic upgrade. | $10,000 |