Back to bathroom remodel contractors
Edmund B Vernile Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Dec 2009
- Last 24 months
- 0 permits filed
10 permits since 2000: 5 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2009 | Never finaled issued Apr 2009, no final | 1317 Hyde St | renovate extg bathroom at 1st floor with replacement wndw at extg light well. in bedroom: replace 2 extg plaster and lathe walls with drywall(insulate and soundproof). in livingroom:replace 1 extg wall/built in hatch with drywall (insulate and sound proof)Details
renovate extg bathroom at 1st floor with replacement wndw at extg light well. in bedroom: replace 2 extg plaster and lathe walls with drywall(insulate and soundproof). in livingroom:replace 1 extg wall/built in hatch with drywall (insulate and sound proof) | $8,839 |