Back to bathroom remodel contractors
Edmisten Construction
- Based in
- Petaluma
- On San Francisco permits
- Feb 2008 to Nov 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 416 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2010 | Completed final sign-off Dec 2011 | 1283 35th Av | repair water damage to sheetrock and sub floor in garage level family room and bathroom and repair main floor bathroom walls and floor to comply nov 201056030Details
repair water damage to sheetrock and sub floor in garage level family room and bathroom and repair main floor bathroom walls and floor to comply nov 201056030 | $20,000 |