Back to bathroom remodel contractors
Edgewood Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2013 to Sep 2026
- Last 24 months
- 5 permits filed
85 permits since 2000: 67 completed, 4 in progress, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 18 completed, 1 never finaled, 3 expired or cancelled. Typically 13 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2026 | Completed final sign-off Sep 2026 | 1610 Leavenworth St | unit 9- in kind kitchen and bathroom remodel. no wall removal or layout change. add (1) electrical stackable washer and ventless dryer.Details
unit 9- in kind kitchen and bathroom remodel. no wall removal or layout change. add (1) electrical stackable washer and ventless dryer. | $15,000 |
| Jun 10, 2026 | Completed final sign-off Aug 2026 | 1418 Leavenworth St | unit 3- in kind kitchen and bathroom remodel. no wall removal or layout change.cDetails
unit 3- in kind kitchen and bathroom remodel. no wall removal or layout change.c | $15,000 |
| Sep 10, 2024 | Completed final sign-off May 2025 | 2137 Lombard St | units # a, b, c: in kind (1) bathroom remodel, (1) in kind kitchen remodel.Details
units # a, b, c: in kind (1) bathroom remodel, (1) in kind kitchen remodel. | $60,000 |
| May 4, 2023 | Completed final sign-off Aug 2023 | 1236 Mason St | (1) bathroom remodel. same location.Details
(1) bathroom remodel. same location. | $15,000 |
| Jan 29, 2020 | Completed final sign-off Apr 2020 | 1330 De Haro St | addition of a new bathroom to an existing room. addition will occur entirely within the envelope of an (e) condo unit in a two unit bldg.Details
addition of a new bathroom to an existing room. addition will occur entirely within the envelope of an (e) condo unit in a two unit bldg. | $15,000 |
| Aug 22, 2019 | Never finaled issued Aug 2019, no final | 528 Haight St | add bathroom to e dwelling unit, new vanity, fiberglass shower unit, new interior partitionsDetails
add bathroom to e dwelling unit, new vanity, fiberglass shower unit, new interior partitions | $3,000 |
| Aug 15, 2019 | Completed final sign-off Aug 2023 | 246 Eureka St | lower level: relocate laundry-add(n)bath, rebuild(e)stair. excavate lightwell,(n)rear bedrm behind garage. 1st fl: demo/relocate powder rm. relocate kitchen, demo(e)breakfast rm, add(n)family rm. 2nd fl: remodel (e)front bedrm. re-organize rear bedrm w/ horizontal addition.add bath,(n) stair to 3rdDetails
lower level: relocate laundry-add(n)bath, rebuild(e)stair. excavate lightwell,(n)rear bedrm behind garage. 1st fl: demo/relocate powder rm. relocate kitchen, demo(e)breakfast rm, add(n)family rm. 2nd fl: remodel (e)front bedrm. re-organize rear bedrm w/ horizontal addition.add bath,(n) stair to 3rd | $1,200,000 |
| Aug 28, 2018 | Completed final sign-off Jul 2019 | 721 Brannan St | revision to 201802272389 & 201807023573. new work to include apprx 1333 sf mezzanine, stair & ada lift. relocation of ada bathroom & structural upgrades of bld a. no exterior changes under this permit.Details
revision to 201802272389 & 201807023573. new work to include apprx 1333 sf mezzanine, stair & ada lift. relocation of ada bathroom & structural upgrades of bld a. no exterior changes under this permit. | $200,000 |
| Aug 31, 2017 | Completed final sign-off Nov 2019 | 1353 Stevenson St | legalize 1 bedroom, 1 bathroom unit (unit 7) per ord 43-14; lower slab and add bicycleparking.Details
legalize 1 bedroom, 1 bathroom unit (unit 7) per ord 43-14; lower slab and add bicycleparking. | $15,000 |
| Jul 3, 2017 | Completed final sign-off Sep 2020 | 2621 Sacramento St | interior renovation of 1 kitchen and 2 bathrooms, add new forced air unit and connect to extg diffusers. n/a for maherDetails
interior renovation of 1 kitchen and 2 bathrooms, add new forced air unit and connect to extg diffusers. n/a for maher | $50,000 |
| Mar 30, 2017 | Completed final sign-off Dec 2017 | 144 Noe St | remodel kitchen, new partitions, remodel (e) bathroom, new lighting, demolition of walls & doors.Details
remodel kitchen, new partitions, remodel (e) bathroom, new lighting, demolition of walls & doors. | $55,000 |
| Nov 3, 2016 | Expired or cancelled cancelled Jan 2026 | 4302 19th St | remodel of bathroom and new lighting fixture in master bedroom.Details
remodel of bathroom and new lighting fixture in master bedroom. | $20,000 |
| Sep 29, 2016 | Expired or cancelled suspend Aug 2021 | 3241 Washington St | remodel of interior unit & associated structural work including relocating kitchen, baths & laundry. replace existing windows or sashes at select locations. install new radiant heat system. new floors, repaint all walls, ceiling & trims. interiors demo less than 75% casement windows street facing,Details
remodel of interior unit & associated structural work including relocating kitchen, baths & laundry. replace existing windows or sashes at select locations. install new radiant heat system. new floors, repaint all walls, ceiling & trims. interiors demo less than 75% casement windows street facing, | $437,000 |
| Jun 24, 2016 | Completed final sign-off Jan 2020 | 3266 24th St | interior renovation of upper floor residential units. upgrade heating, renovate floors, install washer/dryer, renovate bath finishes, upgrade electrical as req, add 1 partition wall on 2nd fl front unit, repair waterproofing and windows in kindDetails
interior renovation of upper floor residential units. upgrade heating, renovate floors, install washer/dryer, renovate bath finishes, upgrade electrical as req, add 1 partition wall on 2nd fl front unit, repair waterproofing and windows in kind | $125,000 |
| Feb 10, 2016 | Completed final sign-off Jun 2016 | 136 Noe St | new partitions to create new bedrooms. convert rear bedroom into living room. relocate bathroom, remodel (e) kitchen. remodel existing bathroom. remove ceiling in rear bedroom and add rigid insulation. replace existing water heater with new tankless water heater.Details
new partitions to create new bedrooms. convert rear bedroom into living room. relocate bathroom, remodel (e) kitchen. remodel existing bathroom. remove ceiling in rear bedroom and add rigid insulation. replace existing water heater with new tankless water heater. | $200,000 |
| Oct 7, 2015 | Completed final sign-off May 2016 | 142 Noe St | new partition walls to create new bedrooms. demo (e) non shear, non structural walls. relocate (e) bathroom, remodel all (e) bathrooms. replace w/h with tankless. remove rear drop ceiling - repair with new- add gyp boardDetails
new partition walls to create new bedrooms. demo (e) non shear, non structural walls. relocate (e) bathroom, remodel all (e) bathrooms. replace w/h with tankless. remove rear drop ceiling - repair with new- add gyp board | $65,000 |
| Oct 1, 2015 | Completed final sign-off Dec 2018 | 3270 24th St | gr fl renovation of permitted restaurant (pa 201406037404) renovate e gr fl retail into restaurant, seismic upgrade of gr fl per 2014iebc appendix a4, mech/elec/plumb for commercial kitchen, accessible bathrooms and egress, remove gr fl lightwell per 201405037404. sprinkler - fire alarm seperate perDetails
gr fl renovation of permitted restaurant (pa 201406037404) renovate e gr fl retail into restaurant, seismic upgrade of gr fl per 2014iebc appendix a4, mech/elec/plumb for commercial kitchen, accessible bathrooms and egress, remove gr fl lightwell per 201405037404. sprinkler - fire alarm seperate per | $500,000 |
| Aug 28, 2014 | Completed final sign-off Mar 2015 | 3979 24th St | revision to 201405095372: enlarge size of new accessible bathroom. relocate door. structrual modifications to address field conditions including new beams and foundation improvementsDetails
revision to 201405095372: enlarge size of new accessible bathroom. relocate door. structrual modifications to address field conditions including new beams and foundation improvements | $4,600 |
| May 9, 2014 | Completed final sign-off Mar 2015 | 3979 24th St | seismic upgrade consisting of ordinary moment frames, foundations, & shear walls. required accessibility improvements per 20% rule including automatic door opener & accessible bathroom upgrade.Details
seismic upgrade consisting of ordinary moment frames, foundations, & shear walls. required accessibility improvements per 20% rule including automatic door opener & accessible bathroom upgrade. | $70,000 |
| Feb 27, 2014 | Expired or cancelled cancelled Oct 2014 | 891 Post St | #101,105,206,210,302,303,310,314,403,405,408,412,414- kitchen & bath remodel of 13 units includes demo of non-structural beams & posts, remodel (e) baths & kitchens, upgrade hvac systems, add electrical fixtures/outlets, replace windows not facing street with same dimension/trim. na #155-13Details
#101,105,206,210,302,303,310,314,403,405,408,412,414- kitchen & bath remodel of 13 units includes demo of non-structural beams & posts, remodel (e) baths & kitchens, upgrade hvac systems, add electrical fixtures/outlets, replace windows not facing street with same dimension/trim. na #155-13 | $300,000 |
| Dec 6, 2013 | Completed final sign-off May 2014 | 5811 Mission St | bathroom and kitchen renovation to a single unit #4 in a multifamily residential bldg. work will include remodel extg kitchen and bathroom, replace and upgrade unit radiator, upgrade electrical system within unit, and upgrade extg studio to a one bedroom unit.Details
bathroom and kitchen renovation to a single unit #4 in a multifamily residential bldg. work will include remodel extg kitchen and bathroom, replace and upgrade unit radiator, upgrade electrical system within unit, and upgrade extg studio to a one bedroom unit. | $20,000 |
| Apr 3, 2013 | Completed final sign-off Oct 2013 | 780 Treat Av | renovation of 2 units - expansion of (e) residential units into (e) unused storage spaces & market; #780 addition of new bedroom, fam room & bath. #782 additional of study & bath. renovation of (e) kitchen & bathrooms, new heating system for both units. sprinklers for new space in units nfpa 13rDetails
renovation of 2 units - expansion of (e) residential units into (e) unused storage spaces & market; #780 addition of new bedroom, fam room & bath. #782 additional of study & bath. renovation of (e) kitchen & bathrooms, new heating system for both units. sprinklers for new space in units nfpa 13r | $61,000 |