Back to bathroom remodel contractors
Eden Roc Co
- Based in
- Corte Madera
- On San Francisco permits
- Mar 2000 to Oct 2023
- Last 24 months
- 0 permits filed
47 permits since 2000: 32 completed, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 9 days from filing to permit and 257 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2017 | Completed final sign-off Jun 2018 | 1070 Green St | #1701: remodel existing kitchen and bathroom - no structural changes. to include plumbing and electrical. cabinetry & doors.Details
#1701: remodel existing kitchen and bathroom - no structural changes. to include plumbing and electrical. cabinetry & doors. | $142,000 |
| Feb 2, 2015 | Completed final sign-off Jun 2015 | 1415 41st Av | replace original kitchen and bathroom fixtures and cabinetry. install new plumbing and electrical knob and tube.Details
replace original kitchen and bathroom fixtures and cabinetry. install new plumbing and electrical knob and tube. | $16,000 |
| May 20, 2014 | Completed final sign-off Oct 2014 | 729 North Point St | remodel top floor bathroom, repair extg stucco on front facade and replace windows with like size units. move washer and dryer from top floor to basement. revision to extg permit #201401246971. n/a for the maher ordinance #155-13Details
remodel top floor bathroom, repair extg stucco on front facade and replace windows with like size units. move washer and dryer from top floor to basement. revision to extg permit #201401246971. n/a for the maher ordinance #155-13 | $60,000 |
| Jan 24, 2014 | Completed final sign-off Oct 2014 | 729 North Point St | stucco/wood repair on street facade. interior plumbing replacements and additions(kitchens and baths) remove extg elevator.Details
stucco/wood repair on street facade. interior plumbing replacements and additions(kitchens and baths) remove extg elevator. | $80,000 |
| Jan 16, 2014 | Completed final sign-off Jul 2015 | 3832 Jackson St | revision to pa 201310310808- add 6 skylights, enclose light wells, move 1 bathroom, open wall to dining room, move bedroom to dining rm, create kitchen nookDetails
revision to pa 201310310808- add 6 skylights, enclose light wells, move 1 bathroom, open wall to dining room, move bedroom to dining rm, create kitchen nook | $87,000 |
| Oct 31, 2013 | Completed final sign-off Jul 2015 | 3832 Jackson St | downstairs lower extg slab 6". move mechanical and new bathroom. upstairs: one new bathroom and on bath remodel.Details
downstairs lower extg slab 6". move mechanical and new bathroom. upstairs: one new bathroom and on bath remodel. | $170,000 |
| Oct 31, 2013 | Completed final sign-off Apr 2014 | 1387 Baker St | bathroom remodel - replace bathroom window in kind. u factor shall not exceed 0.4. environmental air ducts terminate 3' from property line & openings. occupancy sensor therm on time limiting device not exceeding 30 mins.Details
bathroom remodel - replace bathroom window in kind. u factor shall not exceed 0.4. environmental air ducts terminate 3' from property line & openings. occupancy sensor therm on time limiting device not exceeding 30 mins. | $12,000 |
| Aug 23, 2013 | Completed final sign-off Apr 2014 | 1385 Baker St | kitchen & bath remodel, add master bath & reconfigure closets in 2 bedroomsDetails
kitchen & bath remodel, add master bath & reconfigure closets in 2 bedrooms | $135,000 |
| Sep 7, 2011 | Completed final sign-off Aug 2012 | 428 Haight St | remove drywall at bathroom, new plumbing and electrical replacement, replace drywall and new kitchen cabinets.Details
remove drywall at bathroom, new plumbing and electrical replacement, replace drywall and new kitchen cabinets. | $5,200 |
| Aug 30, 2011 | Completed final sign-off Aug 2012 | 426 Haight St | remove drywall from bathroom/new plumbing & electrical replace drywall. remove drywall in kitchen to add new sub panel. work in residential only.Details
remove drywall from bathroom/new plumbing & electrical replace drywall. remove drywall in kitchen to add new sub panel. work in residential only. | $3,500 |
| May 11, 2010 | Completed final sign-off Oct 2010 | 2100 Pacific Av | unit# 1b at ground floor. remodel kitchen and 3 bath rooms, new floors in selected rooms, new gas insert at fire place, new lighting, new door hardware, new laundry area ( side by side instead of existing w/d stack) , removal of non bearing walls.Details
unit# 1b at ground floor. remodel kitchen and 3 bath rooms, new floors in selected rooms, new gas insert at fire place, new lighting, new door hardware, new laundry area ( side by side instead of existing w/d stack) , removal of non bearing walls. | $267,000 |