Back to bathroom remodel contractors
Eden Custom Builers
- Based in
- Castro Valley
- On San Francisco permits
- Jul 2005 to Apr 2010
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2005 | Completed final sign-off Dec 2005 | 190 Precita Av | remove existing fixtures in bathroom, replace with new. remove existing cabinets, countertop in kitchen and replace with new cntrtop, cabinets, and new gfi outlets. unit 190 onlyDetails
remove existing fixtures in bathroom, replace with new. remove existing cabinets, countertop in kitchen and replace with new cntrtop, cabinets, and new gfi outlets. unit 190 only | $11,500 |
| Jul 1, 2005 | Completed final sign-off Sep 2005 | 2744 Irving St | remove (e) stucco on 3 sides of building & install new bath / stucco & paint building (front, back &Details
remove (e) stucco on 3 sides of building & install new bath / stucco & paint building (front, back & | $11,000 |