Back to bathroom remodel contractors
Ed Neale Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2010 to Dec 2018
- Last 24 months
- 0 permits filed
9 permits since 2000: 5 completed, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 26, 2016 | Never finaled issued Apr 2018, no final | 1983 Jefferson St | vertical addition of master suite behind (e) penthouse & roof deck. private ownership of top floor condo. addition will include bedroom & bath & 2 deck levels. nfpa 13r sprinkler system to be provided throughout entire building under separate permit. ** maher: n/a **Details
vertical addition of master suite behind (e) penthouse & roof deck. private ownership of top floor condo. addition will include bedroom & bath & 2 deck levels. nfpa 13r sprinkler system to be provided throughout entire building under separate permit. ** maher: n/a ** | $160,000 |
| Mar 12, 2014 | Completed final sign-off Aug 2014 | 1333 Jones St | #1503b - relocate sub-pnael, remodel kitchen & bth, add pocket door between living & bedroom, extend bath wall, install hardwood floors throughout, replace sliding glass doors.; compliance with ord 155-13 not requiredDetails
#1503b - relocate sub-pnael, remodel kitchen & bth, add pocket door between living & bedroom, extend bath wall, install hardwood floors throughout, replace sliding glass doors.; compliance with ord 155-13 not required | $50,000 |
| Sep 26, 2013 | Never finaled issued Sep 2013, no final | 1983 Jefferson St | master bath alteration - rough toilet, remove (e) sink and move to new location, replace shower pana and valves, replace tub and valves, install new tile, replace sheetrock where disturbed.Details
master bath alteration - rough toilet, remove (e) sink and move to new location, replace shower pana and valves, replace tub and valves, install new tile, replace sheetrock where disturbed. | $10,000 |
| Aug 11, 2010 | Completed final sign-off Oct 2011 | 1100 Union St | unit #401-interior renovation of unit including kitchen & bathroomsDetails
unit #401-interior renovation of unit including kitchen & bathrooms | $150,000 |
| Aug 10, 2010 | Completed final sign-off Mar 2011 | 1981 Jefferson St | convert closet into guest bath. install new plumbing, elec, frame shower pan, tile work. all work at 2nd fl unit 1983Details
convert closet into guest bath. install new plumbing, elec, frame shower pan, tile work. all work at 2nd fl unit 1983 | $10,000 |