Back to bathroom remodel contractors
Ed Beacon Construction
- Based in
- Oakland
- On San Francisco permits
- Aug 2000 to Aug 2018
- Last 24 months
- 0 permits filed
28 permits since 2000: 21 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2006 | Completed final sign-off Jan 2007 | 321 Caselli Av | rottne ledger-siding, king post patio door. plaster 3 walls at rear bedroom. bathroom remodeling at middle floor.Details
rottne ledger-siding, king post patio door. plaster 3 walls at rear bedroom. bathroom remodeling at middle floor. | $7,500 |
| Sep 14, 2004 | Completed final sign-off Oct 2004 | 350 Alabama St | remodel bath, new shower pan, tiles, paint. no structural changesDetails
remodel bath, new shower pan, tiles, paint. no structural changes | $3,000 |
| Jul 23, 2004 | Completed final sign-off Sep 2004 | 242 Mount Vernon Av | no structural changes- remodel whole bathroom, new bathtub, toilet, sink & new fan gfi- flr tilingDetails
no structural changes- remodel whole bathroom, new bathtub, toilet, sink & new fan gfi- flr tiling | $7,500 |
| Nov 27, 2002 | Completed final sign-off Feb 2003 | 240 Montalvo Av | bathroom remodel: replace shower tile, faucet, sink, toilet on the groundfloorDetails
bathroom remodel: replace shower tile, faucet, sink, toilet on the groundfloor | $8,000 |
| Aug 30, 2002 | Completed final sign-off Dec 2002 | 240 Montalvo Av | bathroom remodel, replace bathtub, toilet, sink, and showerDetails
bathroom remodel, replace bathtub, toilet, sink, and shower | $10,000 |
| Apr 4, 2002 | Completed final sign-off Jul 2002 | 74 Museum Wy | remodeling bathroom and kchnDetails
remodeling bathroom and kchn | $13,000 |
| Feb 13, 2002 | Completed final sign-off Apr 2002 | 190 Sussex St | new sink + new bathtub new subfloor. remodeling bathroom,Details
new sink + new bathtub new subfloor. remodeling bathroom, | $3,500 |
| Mar 27, 2001 | Completed final sign-off Jul 2001 | 174 San Carlos St | removed fire damage. not strutural damage.new cabinet in kitchen new flooring, new laundry and bathDetails
removed fire damage. not strutural damage.new cabinet in kitchen new flooring, new laundry and bath | $48,000 |
| Sep 27, 2000 | Completed final sign-off Nov 2000 | 51 Cityview Wy | replace shower , dounstairs bathroom, replace 1 window dounstairs bedroom southDetails
replace shower , dounstairs bathroom, replace 1 window dounstairs bedroom south | $1,500 |
| Aug 3, 2000 | Completed final sign-off Sep 2000 | 149 Marview Wy | construct bedroom with 1 bathroom and closet area in lwr lev of residence garage areaDetails
construct bedroom with 1 bathroom and closet area in lwr lev of residence garage area | $10,000 |
| Aug 2, 2000 | Completed final sign-off May 2024 | 223 23rd Av | new stair to basement,new layout for kitchen dining rm additional bath/lndry rms 2nd lvelDetails
new stair to basement,new layout for kitchen dining rm additional bath/lndry rms 2nd lvel | $70,000 |