Ecostep Inc
- Based in
- Walnut Creek
- On San Francisco permits
- May 2019 to Sep 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 1 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 expired or cancelled. Typically 509 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2021 | Expired or cancelled expired Sep 2026 | 342 Hearst Av | add 427 sq ft addition on grnd flr w/ deck above at main flr level. add 19 sq ft, hallway sairwell from upper flr to lower addition. add 9n) lighting, plumbing and hvac for addition. remodel kitchen.Details
add 427 sq ft addition on grnd flr w/ deck above at main flr level. add 19 sq ft, hallway sairwell from upper flr to lower addition. add 9n) lighting, plumbing and hvac for addition. remodel kitchen. | $210,000 |