Back to bathroom remodel contractors
Ebuild
- Based in
- San Rafael
- On San Francisco permits
- Jan 2011 to Aug 2024
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 12 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2015 | Completed final sign-off Jun 2015 | 1039 Kirkham St | addition of 2nd bath to existing upstairs bath. relocate shower and add 1 shower, 1 toilet, 1 sink. install new window. move interior wall and create opening through load bearing wall. run new wiring to both baths per code with 10 can lights, 4 dedicated circuits to panel. floor heat to bath.Details
addition of 2nd bath to existing upstairs bath. relocate shower and add 1 shower, 1 toilet, 1 sink. install new window. move interior wall and create opening through load bearing wall. run new wiring to both baths per code with 10 can lights, 4 dedicated circuits to panel. floor heat to bath. | $50,000 |