Ebersole Builders
- Based in
- San Rafael
- On San Francisco permits
- Apr 2006 to Jan 2013
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2006 | Completed final sign-off Mar 2007 | 3045 Jackson St | retile bathroom & shower stall. new shower pan, new wet location light in shower, replace outlets with gfci, new window in existing frame. replace, sink, bathtub, shower hardware. retain (e) fixtures & locations. new shower stall door. new light to be flourescent.Details
retile bathroom & shower stall. new shower pan, new wet location light in shower, replace outlets with gfci, new window in existing frame. replace, sink, bathtub, shower hardware. retain (e) fixtures & locations. new shower stall door. new light to be flourescent. | $20,000 |