East Bay Pc Construction Inc
- Based in
- Brentwood
- On San Francisco permits
- Sep 2024 to Mar 2026
- Last 24 months
- 1 permit filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2026 | Completed final sign-off Jul 2026 | 4443 Irving St | rebuild existing size deck like for likeDetails
rebuild existing size deck like for like | $22,800 |
| Sep 9, 2024 | Completed final sign-off Dec 2024 | 211 Cole St | remodel (e) powder rm,r/r tile, toilet, waistcoating with new,add small cornersink,change door swing. (e) light to remain in same location with switch.paint walls/ceilings, waistcoat, trims, door. install new angle stops & faucet, sink / fixtures. in-kindDetails
remodel (e) powder rm,r/r tile, toilet, waistcoating with new,add small cornersink,change door swing. (e) light to remain in same location with switch.paint walls/ceilings, waistcoat, trims, door. install new angle stops & faucet, sink / fixtures. in-kind | $8,500 |