East Bay Construction
- Based in
- San Pablo
- On San Francisco permits
- Jun 2018 to Mar 2019
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2019 | Expired or cancelled cancelled Aug 2019 | 921 Haight St | pour 30 linear feet of new concrete foundation (footing replacement) in the left side ofthe building.Details
pour 30 linear feet of new concrete foundation (footing replacement) in the left side ofthe building. | $12,000 |
| Aug 9, 2018 | Completed final sign-off Sep 2018 | 325 Douglass St | voluntary structural strenghtening. brace perimeter walls by installing anchor bolts and plywood as it show in the drawing.Details
voluntary structural strenghtening. brace perimeter walls by installing anchor bolts and plywood as it show in the drawing. | $18,800 |
| Aug 2, 2018 | Completed final sign-off Aug 2018 | 760 Rhode Island St | voluntary structural strengthening of single family home. 5/8" anchor bolts, 1/2" struct. 1 plywood bracing.Details
voluntary structural strengthening of single family home. 5/8" anchor bolts, 1/2" struct. 1 plywood bracing. | $9,500 |
| Jun 20, 2018 | Completed final sign-off May 2019 | 915 Haight St | voluntary structural upgrade of ground fl. utilizing plywood, shearwalls, replacement of retaining wall at back of building and replacement of gravity framing and footings at 2nd fl.Details
voluntary structural upgrade of ground fl. utilizing plywood, shearwalls, replacement of retaining wall at back of building and replacement of gravity framing and footings at 2nd fl. | $40,000 |