Permit GraphShortlistSan Francisco building permits since 2000

East Bay Construction

Contractor license
956185
State license record
Based in
San Pablo
On San Francisco permits
Jun 2018 to Mar 2019
Last 24 months
0 permits filed

4 permits since 2000: 3 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Mar 21, 2019Expired or cancelled
cancelled Aug 2019
921 Haight Stpour 30 linear feet of new concrete foundation (footing replacement) in the left side ofthe building.
Details
Permit
201903215913
Status
cancelled
Filed
Mar 21, 2019
Permit issued
Mar 21, 2019
Declared cost
$12,000
Address
921 Haight St

pour 30 linear feet of new concrete foundation (footing replacement) in the left side ofthe building.

Open the permit page

$12,000
Aug 9, 2018Completed
final sign-off Sep 2018
325 Douglass Stvoluntary structural strenghtening. brace perimeter walls by installing anchor bolts and plywood as it show in the drawing.
Details
Permit
201808096890
Status
complete
Filed
Aug 9, 2018
Permit issued
Aug 10, 2018
Final sign-off
Sep 6, 2018
Declared cost
$18,800
Address
325 Douglass St

voluntary structural strenghtening. brace perimeter walls by installing anchor bolts and plywood as it show in the drawing.

Open the permit page

$18,800
Aug 2, 2018Completed
final sign-off Aug 2018
760 Rhode Island Stvoluntary structural strengthening of single family home. 5/8" anchor bolts, 1/2" struct. 1 plywood bracing.
Details
Permit
201808026301
Status
complete
Filed
Aug 2, 2018
Permit issued
Aug 6, 2018
Final sign-off
Aug 15, 2018
Declared cost
$9,500
Address
760 Rhode Island St

voluntary structural strengthening of single family home. 5/8" anchor bolts, 1/2" struct. 1 plywood bracing.

Open the permit page

$9,500
Jun 20, 2018Completed
final sign-off May 2019
915 Haight Stvoluntary structural upgrade of ground fl. utilizing plywood, shearwalls, replacement of retaining wall at back of building and replacement of gravity framing and footings at 2nd fl.
Details
Permit
201806202483
Status
complete
Filed
Jun 20, 2018
Permit issued
Aug 16, 2018
Final sign-off
May 9, 2019
Declared cost
$40,000
Address
915 Haight St

voluntary structural upgrade of ground fl. utilizing plywood, shearwalls, replacement of retaining wall at back of building and replacement of gravity framing and footings at 2nd fl.

Open the permit page

$40,000